Browse
Search
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 4:12:50 PM
Creation date
8/6/2014 2:06:17 PM
Metadata
Fields
Template:
BOCC
Date
6/17/2014
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6n - Mgr signed
Amount
$747,840.00
Document Relationships
R 2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. The limitations upon authority and responsibility set forth in this Paragraph 9.09 shall also apply <br /> to the Construction Field Representative,if any,and assistants,if any. <br /> 9.10 (Intentionally deleted) <br /> ARTICLE 10—CHANGES IN THE WORK; CLAIMS <br /> 10.01 Authorized Changes in the Work <br /> A. Without invalidating the Contract and without notice to any surety, Owner may, at any time or <br /> from time to time, order additions, deletions, or revisions in the Work by a Change Order, or a <br /> Work Change Directive. Upon receipt of any such document, Contractor shall promptly proceed <br /> with the Work involved which will be performed under the applicable conditions of the Contract <br /> Documents (except as otherwise specifically provided). A change in the Contract Price or the <br /> Contract Times shall be accomplished only by a written Amendment, a written Change Order, or <br /> a written Work Change Directive. Contractor waives the right to additional compensation or <br /> time unless it first obtains such documents,properly executed by the appropriate parties,prior to <br /> performing any additional Work. No course of conduct or dealings between the parties, no <br /> expressed or implied acceptance of alterations or additions to the Work, and no claim that Owner <br /> has been unjustly enriched by any alterations or additions to the Work shall be the basis of any <br /> claim for an increase in any amount due under the Contract Documents or a change in any time <br /> period provided for in the Contract Documents unless such written documentation is obtained, as <br /> such written documentation is a condition precedent to the Contractor's recovery of additional <br /> money or time. <br /> B. If Owner and Contractor are unable to agree on entitlement to,or on the amount or extent,if any, <br /> of an adjustment in the Contract Price or Contract Times, or both, that should be allowed as a <br /> result of a Work Change Directive, a Claim may be made therefore as provided in Paragraph <br /> 10.05. <br /> 10.02 Unauthorized Changes in the Work <br /> A. Contractor shall not be entitled to an increase in the Contract Price or an extension of the <br /> Contract Times with respect to any work performed that is not required by the Contract <br /> Documents as amended, modified, or supplemented as provided in Paragraph 3.04, except in the <br /> case of an emergency as provided in Paragraph 6.16 or in the case of uncovering Work as <br /> provided in Paragraph 13.04.D. <br /> 10.03 Execution of Change Orders <br /> A. Owner and Contractor shall execute appropriate Change Orders recommended by Engineer <br /> covering: <br /> 1. changes in the Work which are: (i) ordered by Owner pursuant to Paragraph 10.0l.A, (ii) <br /> required because of acceptance of defective Work under Paragraph 13.08.A, or otherwise <br /> nonconforming work or Owner's correction of defective Work under Paragraph 13.09, or <br /> (iii)agreed to by the parties; <br /> EJCDC C-700 Modified Standard General Conditions of the Construction Contract <br /> Copyright 0 2007 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> Page 52 of 81 <br />
The URL can be used to link to this page
Your browser does not support the video tag.