Browse
Search
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 4:12:50 PM
Creation date
8/6/2014 2:06:17 PM
Metadata
Fields
Template:
BOCC
Date
6/17/2014
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6n - Mgr signed
Amount
$747,840.00
Document Relationships
R 2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor further covenants and agrees that Owner retains the right to make such deduction <br /> or offset at any time prior to and including final payment and that the imposition and the <br /> deduction and/or offset of such monies shall not be subject to any notice or claim provisions <br /> of the Contract Documents. Contractor acknowledges that this obligation is separate and <br /> apart from the obligation to pay liquidated damages for delay,if any. <br /> E. Resubmittal Procedures: <br /> 1. Contractor shall make corrections required by Engineer and shall return the required <br /> number of corrected copies of Shop Drawings and submit, as required, new Samples for <br /> review and approval. Contractor shall direct specific attention in writing to revisions other <br /> than the corrections called for by Engineer on previous submittals. <br /> F. Professional Certification: <br /> 1. When professional certification of performance criteria of materials,systems,or equipment is <br /> required by the Contract Documents, Contractor shall provide the person or party providing <br /> the certification with full information on the relevant performance requirements and on the <br /> materials, systems, or equipment that are expected to operate at the Project site. The <br /> certification shall be based on performance under the operating conditions generally <br /> prevailing or expected at the Project site. Engineer shall be entitled to rely upon the accuracy <br /> and completeness of such certification. <br /> 6.18 Continuing the Work <br /> A. Contractor shall carry on the Work and adhere to the Progress Schedule during all disputes or <br /> disagreements with Owner. No Work shall be delayed or postponed pending resolution of any <br /> disputes or disagreements, except as permitted by Paragraph 15.04 or as Owner and Contractor <br /> may otherwise agree in writing. Contractor's refusal or failure to continue with the Work in a <br /> timely manner as a result of any dispute that arises will constitute a material breach of the <br /> Agreement. Owner shall be entitled to specific performance of provisions requiring delivery of <br /> warranties and other required documentation. <br /> 6.19 Contractor's General Warranty and Guarantee <br /> A. Contractor warrants and guarantees to Owner that all Work will be in accordance with the <br /> Contract Documents and will not be defective. Engineer and its officers, directors, members, <br /> partners, employees, agents, consultants, and subcontractors shall be entitled to rely on <br /> representation of Contractor's warranty and guarantee. Unless otherwise stipulated elsewhere <br /> within the Contract Documents, the Contractor's warranty period will begin at Owner's <br /> acceptance and remain in effect for a period of 12 months. If an equipment or material failure <br /> occurs during the Contractor's warranty period, the Contractor's warranty period shall be <br /> extended by a period of time, equal to the down time of the equipment,or time until the material <br /> failure was corrected to the Owner's satisfaction. <br /> B. Contractor's warranty and guarantee hereunder excludes defects or damage caused by: <br /> EJCDC C-700 Modified Standard General Conditions of the Construction Contract <br /> Copyright(D 2007 National Society of Professional Engineers for EJCDC. All tights reserved. <br /> Page 42 of 81 <br />
The URL can be used to link to this page
Your browser does not support the video tag.