Orange County NC Website
show Engineer the services,materials, and equipment Contractor proposes to provide and <br /> to enable Engineer to review the information for the limited purposes required by <br /> Paragraph 6.17.D. <br /> 2. Samples: , <br /> a. Submit number of Samples specified in the Specifications. , <br /> b. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog <br /> numbers, the use for which intended and other data as Engineer may require to enable ' <br /> Engineer to review the submittal for the limited purposes required by Paragraph 6.17.D. <br /> B. Where a Shop Drawing or Sample is required by the Contract Documents or the Schedule of ' <br /> Submittals, any related Work performed prior to Engineer's review and approval of the pertinent <br /> submittal will be at the sole expense and responsibility of Contractor. <br /> C. Submittal Procedures: ' <br /> 1. Before submitting each Shop Drawing or Sample, Contractor shall have: <br /> a. reviewed and coordinated each Shop Drawing or Sample with other Shop Drawings and ' <br /> Samples and with the requirements of the Work and the Contract Documents; <br /> b. determined and verified all field measurements, quantities, dimensions, specified ' <br /> performance and design criteria, installation requirements, materials, catalog numbers, <br /> and similar information with respect thereto; ' <br /> c. determined and verified the suitability of all materials offered with respect to the <br /> indicated application, fabrication, shipping, handling, storage, assembly, and installation ' <br /> pertaining to the performance of the Work; and <br /> d. determined and verified all information relative to Contractor's responsibilities for ' <br /> means, methods, techniques, sequences, and procedures of construction, and safety <br /> precautions and programs incident thereto. <br /> 2. Each submittal shall bear a stamp or specific written certification that Contractor has ' <br /> satisfied Contractor's obligations under the Contract Documents with respect to <br /> Contractor's review and approval of that submittal. <br /> 3. With each submittal, Contractor shall give Engineer specific written notice of any <br /> variations that the Shop Drawing or Sample may have from the requirements of the <br /> Contract Documents. This notice shall be both a written communication separate from the <br /> Shop Drawings or Sample submittal; and, in addition,by a specific notation made on each <br /> Shop Drawing or Sample submitted to Engineer for review and approval of each such ' <br /> variation. <br /> D. Engineer's Review: ' <br /> 1. Engineer will provide timely review of Shop Drawings and Samples. Engineer's review <br /> and approval will be only to determine if the items covered by the submittals will, after ' <br /> EJCDC C-700 Modified Standard General Conditions of the Construction Contract <br /> Copyright©2007 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> Page 40 of 81 <br />