Orange County NC Website
inform the Contractor of any safety violations, and should Engineer or Owner voluntarily point <br /> out safety violations, such actions shall not be construed to mean that Engineer or Owner has <br /> assumed any responsibility for Contractor's compliance with any applicable safety regulations, <br /> codes, or procedures. Contractor is solely responsible for Project safety. <br /> H. Contractor shall promptly report in writing to Owner and Engineer all accidents arising out of or <br /> in connection with the Work that cause death, personal injury, or property damage, giving full <br /> details and statements of any witnesses. <br /> 6.14 Safety Representative <br /> A. Contractor shall designate a qualified and experienced safety representative at the Site whose <br /> duties and responsibilities shall be the prevention of accidents and the maintaining and <br /> supervising of safety precautions and programs. <br /> 6.15 Hazard Communication Programs <br /> A. Contractor shall be responsible for coordinating any exchange of material safety data sheets or <br /> other hazard communication information required to be made available to or exchanged between <br /> or among employers at the Site in accordance with Laws or Regulations. <br /> 6.16 Emergencies <br /> A. In emergencies affecting the safety or protection of persons or the Work or property at the Site or <br /> adjacent thereto, Contractor is obligated to act to prevent threatened damage, injury, or loss. <br /> Contractor shall give Engineer prompt written notice if Contractor believes that any significant <br /> changes in the Work or variations from the Contract Documents have been caused thereby or are <br /> required as a result thereof. If Engineer determines that a change in the Contract Documents is <br /> required because of the action taken by Contractor in response to such an emergency, a Work <br /> Change Directive or Change Order will be issued. <br /> 6.17 Shop Drawings and Samples <br /> A. Contractor shall submit Shop Drawings and Samples to Engineer for review and approval in <br /> accordance with the accepted Schedule of Submittals (as required by Paragraph 2.07) and the <br /> submittal procedures described elsewhere in these Contract Documents. In the event of any <br /> conflict between the submittal procedures noted above and this Paragraph 6.17, the more <br /> stringent requirements shall control. Each submittal will be identified as Engineer may require. <br /> Contractor represents and warrants that all Shop Drawings shall be prepared by persons and <br /> entities possessing expertise and experience in the trade for which the Shop Drawing is prepared <br /> and, if required by the Contract Documents or applicable Laws or Regulations, be a licensed <br /> architect or engineer, as appropriate. <br /> 1. Shop Drawings: <br /> a. Submit number of copies specified in the General Requirements. <br /> b. Data shown on the Shop Drawings will be complete with respect to quantities, <br /> dimensions, specified performance and design criteria, materials, and similar data to <br /> EJCDC C-700 Modified Standard General Conditions of the Construction Contract <br /> Copyright 0 2007 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> Page 39 of 81 <br />