Browse
Search
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 4:12:50 PM
Creation date
8/6/2014 2:06:17 PM
Metadata
Fields
Template:
BOCC
Date
6/17/2014
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6n - Mgr signed
Amount
$747,840.00
Document Relationships
R 2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' no change in related Work will be required, it may be considered by Engineer as an <br /> "or-equal" item, in which case review and approval of the proposed item may, in <br /> Engineer's sole discretion, be accomplished without compliance with some or all of the <br /> requirements for approval of proposed substitute items. For the purposes of this Paragraph <br /> 6.05.A.1, a proposed item of material or equipment will be considered functionally equal <br /> to an item so named if: <br /> a. in the exercise of reasonable judgment Engineer determines that: <br /> ' 1) it is at least equal in materials of construction, quality, durability, appearance, <br /> strength, and design characteristics; and <br /> ' 2) it will reliably perform at least equally well the function and achieve the results <br /> intended by the design concept of the completed Project as a functioning whole; and <br /> ' 3) it has a proven record of performance and availability of responsive service; and <br /> 4) it is equal or better in form, features, operation and maintenance cost and general <br /> configuration; and <br /> 5) it conforms to the requirements of the Contract Documents in all respects, except for <br /> ' make and manufacturer or supplier and minor details of specified equipment; and <br /> b. Contractor certifies in writing that,if approved and incorporated into the Work. <br /> ' 1) there will be no increase in cost to the Owner or increase in Contract Times; and <br /> 2) it will conform substantially to the detailed requirements of the item named in the <br /> ' Contract Documents. <br /> 2. Substitute Items: <br /> a. If in Engineer's sole discretion an item of material or equipment proposed by Contractor <br /> does not qualify as an "or-equal" item under Paragraph 6.05.A.1, it will be considered a <br /> ' proposed substitute item. <br /> b. Contractor shall submit sufficient information as provided below to allow Engineer to <br /> determine if the item of material or equipment proposed is essentially equivalent to that <br /> named and an acceptable substitute therefore. Requests for review of proposed substitute <br /> items of material or equipment will not be accepted by Engineer from anyone other than <br /> ' Contractor. <br /> c. The requirements for review by Engineer will be as set forth in Paragraph 6.05.A.2.d, as <br /> ' supplemented by the General Requirements, and as Engineer may decide is appropriate <br /> under the circumstances. Applications for approval of substitute items of material or <br /> equipment will not be accepted by the Engineer if made as part of a Shop drawing <br /> submittal. The application for use of substitute material or equipment must be made <br /> prior to the submission of a shop drawing by a written communication clearly labeled <br /> "Request for Substitution". Substitute items proposed by Shop Drawings for materials or <br /> ' EJCDC C-700 Modified Standard General Conditions of the Construction Contract <br /> Copyright©2007 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> Page 31 of 81 <br />
The URL can be used to link to this page
Your browser does not support the video tag.