Browse
Search
2014-271 AMS - Riggs-Harrod Builders for Sportsplex lobby renovation $429,550
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-271 AMS - Riggs-Harrod Builders for Sportsplex lobby renovation $429,550
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2014 3:05:27 PM
Creation date
6/24/2014 3:03:10 PM
Metadata
Fields
Template:
BOCC
Date
6/18/2014
Meeting Type
Work Session
Document Type
Agreement
Agenda Item
Chair Signed
Document Relationships
R 2014-271 AMS - Riggs-Harrod Builders for Sportsplex lobby renovation
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment#1 <br /> date: April 3 2014 <br /> from: Ron Cox <br /> subject: Addendum items Sportsplex <br /> 1.Moveable partitions to have an STC rating of 50 or higher <br /> 2. Roof drain discharge to be just above sidewalk through the low brick wall <br /> beside the sidewalk <br /> 3. Add alternate on sheet A1.1 for obscure glass is for lower lites of window wall <br /> only. <br /> 4. There should be an additional add alternate to apply translucent film to these <br /> lower lites in lieu of obscure glass. <br /> 5. Wall section detail 3/A3.2 calls for 5/8" densglas. This should be DensDeck <br /> instead <br /> 6. Owner to verify that there is enough stored matching brick for foundation wall. <br /> 7. Demo plan: Contractor to remove flooring in room 101 and 105. And where <br /> required for room 110. Owner will remove flooring in other areas that receive <br /> rubber flooring. <br /> 8. Finish Schedule: Flooring in room 110 to be Vinyl tile not rubber as shown on <br /> the finish schedule. This flooring to be installed by the Contractor. <br /> 9. Existing doors and frames may be reused if they are not damaged. <br /> Ron Cox <br /> Gc�fit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.