Orange County NC Website
Attachment#1 <br /> 7. Previous Installation: Provide the following information on similar projects on which <br /> proposed substitution was used, list projects in the locale of the project primarily and <br /> then in other areas that best represent its application on this project: <br /> Name and Address Date of Name, Address, and <br /> of Pr "e Installation Phone # of Architect <br /> A. <br /> B. <br /> C. <br /> D. <br /> 8. In making a request for substitution, the Manufacturer represents that: <br /> A. He has examined the Drawings and Specifications and has determined that, to <br /> the best of his knowledge, the proposed substitution is appropriate for the use <br /> intended in the Drawings and Specifications. <br /> B. He will provide the same or better warranty for substitution as for product or <br /> method specified. <br /> C. The product is equal or better in quality and serviceability to the specified item. <br /> Name of Manufacturer and signature of Manufacturer's Rep. Date <br /> Name of Contractor and signature Date <br /> END OF SECTION <br />