Orange County NC Website
Attachment#1 <br /> REQUEST FOR SUBSTITUTION <br /> TO: Ben Burke <br /> President, Burke Design Group, PA <br /> Email Work : benburke @nc.rr.com <br /> FROM: <br /> Name of manufacturer <br /> Street address <br /> City and state <br /> Phone number and name of person to contact <br /> PROJECT: Name: Sportsplex Renovations <br /> City, State: Hillsborough, North Carolina <br /> 1. Specification Section and Paragraph numbers of product specified <br /> 2. Proposed Substitute <br /> A. Name and Model No.: <br /> B. Description: <br /> C. Attach applicable Submittals as required by the referenced Specification <br /> Section, i.e. Product Data, Materials List, Shop Drawings, Samples, Design <br /> Data, Test Reports, and Certificates. Attach Shop Drawings to the effect of the <br /> proposed substitution on adjacent components of the Work. <br /> D. Insert Numbers of applicable reference standards: <br /> E. Attach a color chart, if applicable. <br /> F. Attach installation instructions. <br /> 3. Manufacturer's Reputation: Attach the following: <br /> A. Evidence of reputation for prompt delivery. <br /> B. Evidence of reputation for efficiency in servicing products. <br /> 4. Comparison: Attach an itemized comparison of the proposed substitution with <br /> product specified. Significant qualities may include elements such as size, weight, <br /> durability, performance, and visual effects. _ <br /> 5. Changes in Work: Attach data relating to changes required in other work to permit <br /> use of proposed substitution and changes required in construction schedule and <br /> overall contract time. Coordinate changes or modifications needed to other parts of <br /> the Work and to construction performed by the Owner and separate Contractors that <br /> will be necessary to accommodate the proposed substitution. <br /> 6. Cost Data: Attach accurate cost data on proposed substitution in comparison with <br /> product specified. <br />