Browse
Search
2014-271 AMS - Riggs-Harrod Builders for Sportsplex lobby renovation $429,550
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-271 AMS - Riggs-Harrod Builders for Sportsplex lobby renovation $429,550
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2014 3:05:27 PM
Creation date
6/24/2014 3:03:10 PM
Metadata
Fields
Template:
BOCC
Date
6/18/2014
Meeting Type
Work Session
Document Type
Agreement
Agenda Item
Chair Signed
Document Relationships
R 2014-271 AMS - Riggs-Harrod Builders for Sportsplex lobby renovation
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Owner: Contractor: <br /> Orange County Riggs-Harrod Builders, Inc. <br /> Attn: Jeff Thompson 1117 East Geer Street <br /> P.O.Box 8181 Durham,NC 27707 <br /> Hillsborough,NC 27278 <br /> 8. MISCELLANEOUS <br /> a. Duties and Obligations imposed by the Contract Documents shall be in addition to any Duties <br /> and Obligations imposed by state,federal or local law,rules,regulations and ordinances. <br /> b. No act or failure to act by the Owner or Contractor shall constitute a waiver of any right or <br /> duty granted them under the Contract Documents, nor shall any act or failure to act constitute <br /> any approval except as specifically agreed in writing. <br /> c. The Work shall be tested and inspected as required by the Contract Documents and as required <br /> by law. Unless prohibited by law the costs of all such tests and inspections related to state and <br /> federal codes such as ADA, Administrative, Electrical, Plumbing, Mechanical and Building <br /> Codes shall be borne by the Contractor. The costs for material and structural testing shall be <br /> conducted by an independent third party at the expense of the Owner. Delays related to any of <br /> the aforementioned tests and inspections shall not be grounds for delaying the completion of <br /> the work. If any such tests and inspections reveal deficiencies in the Work such that the Work <br /> does not comply with terms or requirements of the Contract Documents and/or the <br /> requirements of any code or law the Contractor is solely responsible for the cost of bringing <br /> such deficiencies into compliance with the terms of the Contract Documents and/or any code <br /> or law. <br /> d. Should the Designer, if a Designer is retained for the project involving the Work, or Owner <br /> reject any portion of the Work for failing to comply with the Contract Documents Contractor <br /> shall immediately, at Contractor's expense, correct the Work. Any such rejection may be <br /> made before or after substantial completion. If applicable,any additional expense borne by the <br /> Designer under this section shall be paid at Contractor's expense. <br /> e. The Contractor shall not assign any portion of this Agreement nor subcontract the Work in its <br /> entirety without the prior written consent of the Owner. <br /> 9. CONSEQUENTIAL DAMAGES <br /> a. Owner and Contractor mutually waive any claim against each other for consequential damages. <br /> Consequential Damages include: <br /> (i) Damages incurred by Owner for loss of use,income,financing,or business. <br /> (ii) Damages incurred by Contractor for office expenses, including personnel, loss of <br /> financing, profit, income, business, damage to reputation, or any other non-direct <br /> damages. <br /> 10. ENTIRE AGREEMENT <br /> All of the documents listed, referenced or described in this Agreement,the written Notice-to-Proceed, <br /> together with Modifications made or issued in accordance herewith are the Contract Documents,and the work, <br /> labor, materials and completed construction required by the Contract Documents and all parts thereof is the <br />
The URL can be used to link to this page
Your browser does not support the video tag.