Orange County NC Website
Attachment#1 <br /> FORM OF PROP 0 SAL (Revised) <br /> Sportsplex Renovation &Addition Contract: <br /> Orange County Bidder: <br /> Date: <br /> The undersigned, as bidder, hereby declares that the only person or persons interested in this proposal as <br /> principal or principals is or are named herein and that no other person than herein mentioned has any interest in <br /> this proposal or in the contract to be entered into; that this proposal is made without connection with any other <br /> person, company or parties making a bid or proposal; and that it is in all respects fair and in good faith without <br /> collusion or fraud. The bidder further declares that he has examined the site of the work and the contract <br /> documents relative thereto, and has read all special provisions furnished prior to the opening of bids; that he has <br /> satisfied himself relative to the work to be performed. <br /> The Bidder proposes and agrees, if this Proposal is accepted, to contract with the Owner in the form of contract <br /> specified,to furnish all necessary materials, equipment, machinery,tools, apparatus, means of transportation and <br /> labor necessary to complete all construction of the subject project in accordance with the Drawings,Specifications, <br /> and Contract Documents, to the full and entire satisfaction of the Owner and the Architect, with a definite <br /> understanding that no money will be allowed for extra work, except as set forth in the General Conditions and <br /> Contract Documents for the sum of: <br /> SINGLE PRIME CONTRACL <br /> Base Bid: <br /> Dollars($) <br /> General Subcontractor: Plumbing Subcontractor: <br /> Lic Lic <br /> Mechanical Subcontractor: Electrical Subcontractor: <br /> Lic Lic <br /> GS143-128(d)requires all single prime bidders to identify their subcontractors for the above subdivisions of work. A contractor whose bid is accepted shall not <br /> substitute any person as subcontractor in the place of the subcontractor listed in the original bid,except(i)if the listed subcontractor's bid is later determined by the <br /> contractor to be non-responsible or non-responsive or the listed subcontractor refuses to enter into a contract for the complete performance of the bid work,or(it) <br /> with the approval of the awarding authority for good cause shown by the contractor. <br /> ALTERNATES. <br /> Should any of the alternates as described in the contract documents be accepted,the amount written below shall <br /> be the amount to be"deducted from"or"added to" the base bid. <br /> GENERAL CONTRACT- <br /> Alternate No. 1a Replace existing glass in lower lites with opaque or obscure glass, use <br /> existing frames <br /> Add Dollars($) <br /> Alternate No. lb Price to apply satin film to existing glass in lower lites <br /> Add Dollars($) <br /> Alternate No. 2 Alternate Price for RTAHU-3 Roof top unit <br /> Add Dollars($) <br /> The bidder further proposes and agrees hereby to commence work under this contract on a date to be specified in a written order of the designer and shall fully <br /> complete all work thereunder within the time specified in the General Conditions Article 13. Applicable liquidated damages amount is also stated in the General <br /> Conditions Article 13. <br />