Orange County NC Website
MMF <br />The functional groupings based on related service functions or like client base, <br />remained fairly consistent with the 2000 report. However, three new categories were <br />created to reflect the organization changes that have occurred: <br />1. Parks and Open Space <br />A new category that has been titled "Parks/Open Space" was created to more <br />accurately capture the department's evolutionary role. Parks is coupled with the <br />Environment Resource Conservation Department (ERCD) as one with whom adjacency <br />would be most beneficial. <br />Update: ERCD has opted to not be adjacent to the *.Parks function. <br />Recommendations for location(s) are included with the departmental write ups. <br />2. Agriculture Services <br />The Agriculture Services function has also been added to more accurately reflect the <br />focus of departments who would remain at the current Planning and Agriculture <br />Building. Agriculture Services departments would include Cooperative Extension and <br />Soil and Water, as well as USDA Rural Development and the Farm Service Agency, two <br />non-County programs currently at the Planning and Ag Building. <br />3. Animal Services <br />The Animal Services functional group was added in order to acknowledge the County's <br />new and expanded role in this area. While the Animal Shelter building has always been <br />a County facility, the County also assumed operation of the Shelter in July 2004. This <br />group includes the Animal Shelter, Animal Control and the Animal Services Director. <br />unctions Not Included In Study <br />Jail and Court functions. <br />,Expansion of approximately 25,000 square feet to the Courthouse is currently under <br />design pursuant to the recommendations included in the Justice Facilities Reports,.as <br />written in 1995 and updated in 1998. The new addition will house both court offices and <br />the Sheriff's Department. Additional future expansion of the Courthouse is not <br />contemplated, however, long term space needs of the court system may be met through <br />reallocation of County office space in downtown Hillsborough as court needs dictate and <br />as new County facilities are brought on line. The first such step will occur when space <br />vacated by the Sheriff's office is reallocated to accommodate court-related functions. <br />Update: Since the Justice Facilities Expansion will be limited to a single addition <br />and since the addition of 25,000 square feet would not support the long-term <br />need of the Sheriff's office and the ' Court system, the Board approved the project <br />for approximately 38,000 square feet, a 13,000 square foot increase over the <br />original project <br />