Browse
Search
Agenda - 11-09-2006-1c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 11-09-2006
>
Agenda - 11-09-2006-1c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2013 9:03:17 AM
Creation date
8/28/2008 9:09:37 AM
Metadata
Fields
Template:
BOCC
Date
11/9/2006
Document Type
Agenda
Agenda Item
1c
Document Relationships
Minutes - 20061109
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A second option for ERCD has recently become available as well. With the <br />approval of the expanded County Campus project, which will provide the <br />expansion space needed for Planning and Environmental Health functions, the <br />need to provide additional space at the Planning and Agriculture Building is less <br />critical. ERCD could, therefore, maintain offices at their present location. <br />The Arts Commission location is recommended for the Graham Building in <br />Hillsborough, pursuant to earlier studies. <br />The Recreation and Parks Administrative offices, and any part of the Parks <br />Operations Base that is conducive to the site is recommended for the current site <br />of the Emergency Management Offices on New Hope Church Road. As will be <br />indicated further in this document, Emergency Management (EM) operations are <br />recommended for relocation to the Meadowlands facility in Hillsborough. EM <br />desires to fulfill a long -term goal by maintaining a limited amount of space at the <br />current building in order to provide redundant communications capabilities. <br />Approximately 4,500 square feet of space is available for reallocation to <br />Recreation and Parks. <br />This location is in close proximity(less than one mile) to the Blackwood Farm on <br />Highway 86, which was presented as the preferred location of parks operations in <br />the Parks. Strategic Plan. <br />The Parks Operations base currently occupies 4,000 square feet of leased space <br />in the vicinity of Highway 86170A. This level of development, combined with the <br />administrative space requirements, will be challenging to accommodate at the <br />New Hope Church Road site. Additional facilities for a parks operations base <br />could be considered during the development of the Blackwood Farm master plan. <br />The timeline for the funding of this project remains as a 2A project, which <br />provides funding during FY 2011, FY 2012 or FY 2013. <br />XV <br />
The URL can be used to link to this page
Your browser does not support the video tag.