Browse
Search
Agenda - 06-17-2014-13 (8)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 06-17-2014 - Regular Mtg.
>
Agenda - 06-17-2014-13 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2015 2:59:00 PM
Creation date
6/17/2014 4:17:36 PM
Metadata
Fields
Template:
BOCC
Date
6/17/2014
Meeting Type
Budget Sessions
Document Type
Agenda
Agenda Item
13-8
Document Relationships
Minutes 06-17-2014
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INFORMATION ITEM <br />ORANGE COUNTY PLANNING & INSPECTIONS DEPARTMENT <br />Craig N. Benedict, AICP, Director <br />Administration <br />(919) 245 -2575 131 W. Margaret Ln. <br />(919) 644 -3002 (FAX) P. O. Box 8181 <br />,w, <br />m Hillsborough, NC 27278 <br />www.co.orange.nc.us <br />MEMORANDUM <br />To: Board of County Commissioners <br />Through: Michael Talbert, Interim County Manager <br />From: Craig Benedict, Planning Director <br />Kevin Lindley, PE, Staff Engineer <br />Date: May 30, 2014 <br />RE: County Water and Sewer Project Progress Update <br />There are a number of County - funded water and sewer projects currently underway. These <br />projects are in various stages of progress, from conceptual design and master planning to <br />construction. Staff has developed this memo to give a current progress update on these projects <br />and highlight upcoming project milestones. <br />BUCKHORN - MEBANE PHASE 2 UTILITIES <br />This project is currently under construction and is approximately 85% complete. A portion of <br />water line along Washington Street in the Buckhorn community associated with this project has <br />already been certified and is in use. The 18" gravity sewer portion of this project has been <br />completed and is expected to be certified in the next few weeks. This line runs north of Bowman <br />Road between Rock Quarry Road and Mebane's Regional Pump Station. This is also the sewer <br />line to which the new Morinaga Plant will connect. The entire project is expected to be <br />completed by the end of August 2014, with final closeout by the end of September 2014. <br />MCGOWAN CREEK INTERCEPTOR <br />This project is an improvement to the Efland sewer system. It is currently under construction <br />and is approximately 85% complete. The contractor is expected to complete all pipe Laying by <br />mid -July, at which point they will begin decommissioning the McGowan Creek Pump Station. <br />Project closeout is expected by the end of August to mid - September 2014. <br />
The URL can be used to link to this page
Your browser does not support the video tag.