Orange County NC Website
74 <br /> Michael Harvey <br /> From: Janine Schreyack <janine @manaengineers.com> <br /> Sent: Monday,April 28,2014 10:38 AM <br /> To: Patrick R. Mallett <br /> Cc: Michael A Neal; Michael Harvey <br /> Subject: RE:Triple Crown Comments <br /> Mr. Mallett: <br /> For the stormwater management Ian stabilization under NCG01 there is <br /> a 7 14 day stabilization required g p / Y q ed per NCDENR <br /> depending upon the site area description. We have revised Note 2 under the Grading Notes on Sheet 1: Title Sheet to <br /> reflect this. Under the Grading comments on the Title Sheet of the plans we mention a pre-construction meeting. <br /> We acknowledge that a stormwater management plan and sediment and erosion control plan will need to be included <br /> as well as 401/404 Permits obtained if the threshold is met during the construction design phase. <br /> Thanks. <br /> Janine Schreyack, PE <br /> Michael A. Neal&Associates, PLLC <br /> 105 W. Corbin Street,Suite 201 <br /> Hillsborough, NC 27278 <br /> 919-644-1277 <br /> From: Michael A Neal [mailto:mneal@manaengineers.com] <br /> Sent: Monday, April 28, 2014 9:46 AM <br /> To: Janine Schreyack <br /> Subject: FW: Triple Crown Comments <br /> -----Original Message----- <br /> From: Patrick R. Mallett [ma i Ito:pmaIlett(ftranoecountync.Qov] <br /> Sent: Monday,April 28, 2014 9:36 AM <br /> To: Michael A Neal <br /> Cc: Michael Harvey; Steve J Kaltenbach; Wesley Poole <br /> Subject: FW:Triple Crown Comments <br /> Michael, <br /> See the comments below from Erosion Control. Please feel free to coordinate with Wes and Steve as needed desired. <br /> Very Respectfully, <br /> Patrick R. Mallett, Planner II <br /> Orange County Planning& Inspections Department <br /> 1 <br />