Orange County NC Website
• 3 <br /> b. SOUTH: Single-family residences on lots ranging in area from 1.5 <br /> to 5 acres zoned RB and University Lake Protected Watershed <br /> Protection Overlay District. <br /> c. EAST: Single-family residences on lots ranging in area from 6 to 10 <br /> acres zoned RB and University Lake Protected Watershed <br /> Protection Overlay District. <br /> d. WEST: Dairyland Road, single family residences on lots ranging in <br /> area from 9 to 14 acres all zoned RB, University Lake Protected <br /> Watershed Protection Overlay District, and Special Flood Hazard <br /> Area Overlay District. <br /> Development Process, Schedule, and Action: The typical cadence for the review of a major <br /> subdivision is as follows: <br /> • First Action — Planning staff schedules a Neighborhood Information Meeting (NIM). <br /> Staff Comment — DONE. This meeting was held on October 3, 2013. A <br /> synopsis of comments from this meeting is contained within Attachment 5. <br /> • Second Action — The Planning Board reviews and takes action on the Concept <br /> Plan application approving either the `conventional' or `flexible development' layout. <br /> Staff Comment— DONE. The Concept Plan application package was approved <br /> at the November 6, 2013 Planning Board meeting with a `flexible development' <br /> layout. Agenda materials for this meeting can be viewed at: <br /> http://www.co.orange.nc.us/planning/documents/PBAgend allov2013-web.pdf. <br /> Minutes from this meeting are contained in Attachment 6. <br /> • Third Action — Once a concept plan is approved, the Planning Board reviews and <br /> makes a recommendation on the approval of the Preliminary Plat for the project. <br /> Staff Comment. - DONE. The Planning Board met at its May 7, 2014 regular <br /> meeting and voted unanimously to recommend approval of the preliminary plat <br /> application packet. <br /> Agenda materials for this meeting can be viewed at: <br /> http://orangecountync.gov/planning/documents/5.7.14PBAgenda.pdf <br /> Draft Minutes from this meeting are contained in Attachment 7. <br /> • Fourth Action — The BOCC reviews and takes action on the Preliminary Plat <br /> application. <br /> Staff Comment. - The item is set for the BOCC meeting on June 17, 2014. <br /> • Fifth Action — Once all construction activities have been completed, or appropriate <br /> bonds have been approved, staff will sign off and allow the recordation of a Final <br /> Plat allowing for the individual lots to be created. <br /> Proposal: The petitioner has submitted a Major Subdivision Preliminary Plat application package, <br /> consistent with the approved Concept Plan, proposing to develop a Conservation Cluster Flexible <br /> Development Subdivision with 20 single-family residential lots at a density of one (1) dwelling unit per <br /> every 5 acres of land area with approximately 38 acres of dedicated open space. <br />