Orange County NC Website
15 <br /> • Configure server reboots <br /> • Configure XenDesktop policies <br /> • Configure printing design <br /> • Install and configure the appropriate internal portal <br /> • Install and configure NetScaler Gateway if appropriate <br /> • Install and configure remote administration <br /> • Install and configure Citrix Receiver <br /> • Install and configure Microsoft Remote Desktop Services Licensing <br /> • Install and configure Windows System Policies <br /> • Configure a ro riate level of monitoring <br /> Implementation Phase • Prepare for and schedule meeting with the staff of Orange County <br /> Checkpoint for formal presentation of the findings throughout the <br /> Implementation phase. <br /> Readiness Phase Estimated Time: 10 Days <br /> Test • Develop and document test procedures <br /> • Perform test on both scalability and functionality <br /> Production Pilot • Train pilot users <br /> • Conduct pilot <br /> • Conduct interviews with pilot users and documents responses <br /> • Document pilot results <br /> Rollout Additional Servers • Install any additional servers via the installation policies and <br /> procedures documented in the above phases <br /> Change Management • Implement Change Management policies and procedures <br /> Readiness Phase • Prepare for and schedule meeting with Orange County for formal <br /> Checkpoint presentation of the findings throughout the Readiness phase <br /> Rollout Estimated Time, 15 Days <br /> End-point Deployment • Secure existing end-user data prior to end-point reconfiguration <br /> • Implement necessary changes to the production end-points to <br /> integrate them into the solution <br /> End-User Training • Create End-User training documentation <br /> • Gather users for formal training <br /> Administrator Training • Create administration documentation <br /> • Meet users that will be empowered with Citrix XenApp administrator <br /> privileges and provide formal admin training <br /> Go Live • Obtain sign off for live rollout <br /> • Distribute end user documentation <br /> • Configure rollout users <br /> • Go Live <br /> Rollout Phase Checkpoint . Prepare for and schedule meeting with Orange County for formal <br /> presentation of the findings throughout the rollout phase. <br /> Out of Scope (Tasks to be performed by Orange County staff if applicable) <br /> Router Configuration . Network Address Translation <br /> • Firewall Changes TCP 1494/2598 <br /> VPN Configuration (If • Client installs <br /> Applicable) . VPN Hardware changes j <br /> Infrastructure • Physical server hardware deployment <br /> Implementation • Physical server management <br /> 5 <br />