Browse
Search
Agenda - 06-17-2014 - 6r
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 06-17-2014 - Regular Mtg.
>
Agenda - 06-17-2014 - 6r
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2014 3:42:08 PM
Creation date
6/17/2014 2:34:22 PM
Metadata
Fields
Template:
BOCC
Date
6/17/2014
Meeting Type
Budget Sessions
Document Type
Agenda
Agenda Item
6r
Document Relationships
Minutes 06-17-2014
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1C <br /> Project Scope <br /> Assessment Phase Estimated Time: 15 Days <br /> Project Plan Prepare and document detailed prqject plan <br /> Infrastructure Prepare for assessment questions and inquiry <br /> Assessment Schedule times and meetings with the Orange County personnel for <br /> questions and inquiries. . <br /> • Document and present assessment <br /> • Review networking infrastructure <br /> • Review Microsoft Active Directory for project worthiness <br /> Proof of Concept . Define and document assumptions <br /> • Define tests and success criteria <br /> • Perform tests <br /> Document results <br /> Analysis Phase • Prepare for and schedule meetings with the Orange County staff for <br /> Checkpoint a formal presentation of the Analysis Phase deliverable <br /> Design Phase Estimated Time: 5 Days <br /> Server Design . Define and document the following sections: <br /> • Hardware Requirements <br /> • Software Requirements <br /> Citrix XenDesktop Define XenDesktop FlexCast Architecture <br /> FlexCast Design Server Virtualization Design <br /> ■ XenDesktop FlexCast Farm Design <br /> ■ XenDesktop FlexCast Controller Design <br /> ■ XenDesktop FlexCast Data Store Design <br /> ■ XenDesktop FlexCast Load Management Design <br /> ■ Application Integration Design <br /> ■ XenDesktop FlexCast Printing Design <br /> • Application Delivery Architecture <br /> ■ Web Interface/CloudGateway Portal Design <br /> ■ Citrix Receiver Client Design <br /> Remote Access Architecture <br /> ■ Citrix NetScaler Gateway Design <br /> Infrastructure Design • User Data Design <br /> Profile Management (User Virtualization) Design <br /> • Infrastructure Design <br /> Design Phase Checkpoint . Prepare for and schedule meeting with Orange County for a formal <br /> presentation of the Design Phase deliverable <br /> Implementation'' Estimated Time; 20 Days <br /> Phase <br /> Develop Installation ■ Review and prepare the network environment <br /> Procedures &Build the • Review and prepare Microsoft Active Directory infrastructure <br /> Citrix XenDesktop . Review and configure hardware resources for the implementation <br /> FlexCast Environment . Configure server virtualization aspects of the project <br /> • Configure various data stores <br /> • Prepare Microsoft Windows 2008 R2 servers <br /> • Install and configure Citrix licensing <br /> • Install and configure appropriate Citrix XenDesktop FlexCast <br /> components <br /> • Tune XenDesktop FlexCast implementation <br /> • Configure Citrix Administrators I <br /> • Add XenDesktop imaging technologies if applicable <br /> • Install application, <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.