Browse
Search
Agenda - 11-02-2006-8a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 11-02-2006
>
Agenda - 11-02-2006-8a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2018 10:13:46 AM
Creation date
8/28/2008 9:08:45 AM
Metadata
Fields
Template:
BOCC
Date
11/2/2006
Document Type
Agenda
Agenda Item
8a
Document Relationships
2006 S Purchasing - Consideration for Approval: Expanded County Campus Proposal
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2006
Minutes - 20061102
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• construction quality history. <br />• experience and performance history. <br />13 <br />• ability to complete each element of the Project within its respective <br />Contract Time. <br />• ability to complete the entirety of the Project within the budgeted Project <br />Cost. <br />' • cost of construction oversight. <br />• financial stability. <br />• stability of principal subcontractors (electrical, mechanical, plumbing, <br />framing, masonry, sitework). <br />• bonding capacity and rating of surety. <br />• value engineering experience. <br />• minority business participation plan in compliance with G.S. 143-128.2. <br />• amenability to contracting pursuant to modified AIA Contract Documents <br />to be prepared by TCM. <br />TCM will require the single prime general contractor to furnish 100% <br />performance and payment bonds which name TCM's construction lender, TCM <br />and the County as joint obligees. <br />TCM will reserve the right to withdraw from the Project without penalty or <br />liability in the event TCM determines, in its discretion, that the lowest <br />responsible, responsive bidder is nonetheless unacceptable to TCM. <br />6. Project Completion Schedule. <br />Office building/ library/parlcing <br />facility) substantial completion 05/2008 <br />Closing of purchase of office <br />building and library 05/2008 <br />Licensure of parking spaces <br />to County 05/2008 <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.