Orange County NC Website
ii <br /> HOBBS,UPCHURCH&ASSOCIATES,P.A. Buckhom-Mebane EDO Sewer Improvements <br /> Consulting Engineers Orange County,NC <br /> Southern Pines,NC <br /> Phase 2-West Ten Road Pump Station <br /> Opinion of Probable Costs <br /> 22-Aar-14 <br /> 20"Steel casing installed on grade crossing Rail line <br /> 36 for the orcDosed 84nch gravitt sewer 295 LF $600.00 $177,000.00 <br /> 24"Steel casing installed on grade crossing 1-40185 <br /> 37 for the proposed 124nch graft sewer 330 LF $760.00 $247,600.00 <br /> 38 4'0"Diameter Manhole 8'-8' 7 EA $2,000.00 $14,000.00 <br /> 39 4'0"Diameter Manhole(9-101 5 EA $2,20000 $11.000.00. <br /> 40 4'0"Diameter Manhole 10'-12' 2 EA $2.550.00 $6100. <br /> 41 4'0"Diameter Manhole 12=14' 1 EA $3,000.00 $3,000.001 <br /> 42 4'0"Diameter Manhole 14'-16' 2 EA $3,350.00 $6,700.00 <br /> 43 5'0"Diameter Manhole 16'-18' 2 EA $4,700.00 $9,400. <br /> 44 5'0"Diameter Manhole 20'-22' 0 EA $6,1 00.00 $0.00 <br /> 45 5'0"Diameter Manhole 22'-24' 0 EA $6.600.00 $0.00 <br /> 46 5'0"Diameter Manhole 24-28' 3 EA $7100.00 $21,300.00 <br /> 47 6'0"Diameter Manhole 26'-28' 1 EA $7,700.00 $7,700.00 <br /> 48 5'0"Diameter Manhole 29'-30' 0 EA $10100.00 $0.00 <br /> 49 Select Fill Allowance 6,000 CY $18. $108,000.00 <br /> 50 Rock Excavation and Disposal Allowance 9,500 CY $65.00 $617,500.00 <br /> 51 Dewaterin Provisional 1 LS $30.000.00 $30,000.00 <br /> 52 IPump Station 1 LS $675,000.00 $675,000.00 <br /> 53 1 Pump Station Site Work 1 LS 1 $40,000.00 $40,000.00 <br /> Item C Subtotal $2,582,620.00 <br /> 54 8"PVC SDR 35 Gravity Sewer 6'-10' 875 LF $40.00 $36,000.00 <br /> 55 4'0"Diameter Manhole 6'-8' 2 EA $2 000.00 $4 000.00 <br /> 56 4'0"Diameter Manhole 8'-10' 1 EA $2,200.00 $2.200.00 <br /> 57 jAsphalt O en Cut and Patch 930 SY $50.00 $46,500.00 <br /> Item 0 Subtotal $87,700.00 <br /> 55 8"PVC SDR 35 Gravity Sewer 6'-10' 815 LF $40.00 $32,600.00 <br /> 58 4'0"Diameter Manhole 6'-8' 3 EA $2,000-00 $6.000.00 <br /> 57 lAsphalt Open Cut and Patch 550 Sy $50.00 $27.500.001 <br /> Item E Sub total $69,100.0 <br /> Sub-total $3,970,770.00 <br /> Contan enc (10%) 077. <br /> Subtotal $4,367,847.00 <br /> Enginesiring Design I Survey/ROW Acquisition Fees $317,000.00 <br /> Railroad Encroachment $30,000.0 <br /> Gootechnical Report Fees Not-to-Exceed $20,000.00 <br /> Wetlands Delineation Fees Not-to-Exceed $10,000.0 <br /> Permit Fees $5,000.00 <br /> Page 2 of 2 <br />