Browse
Search
2014-247 Planning - Hobbs Upchurch Associates for Buckhorn Mebane EDC District Phase II $393,000
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-247 Planning - Hobbs Upchurch Associates for Buckhorn Mebane EDC District Phase II $393,000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2014 12:16:54 PM
Creation date
6/5/2014 12:16:21 PM
Metadata
Fields
Template:
BOCC
Date
5/8/2014
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6h
Document Relationships
R 2014-247 Planning - Hobbs, Upchurch & Associates - Amendment #2 Buckhorn Mebane Phase 2 Extensions
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOBBS,UPCHURCH d.ASSOCIATES.P.A- Buckhom-Mebane EM Sewer Improvements <br /> Consulting Engineers Orange County,NC <br /> Southern Pines,NC <br /> Phase 2-West Ten Road Pump Station <br /> Opinion of Probable Costs <br /> 22-Apr-14 <br /> ITEM DESCRIPTION QTY. UNIT UNIT PRICE TOTAL PRICE <br /> 1 Seed&Mulch d.Erosion Control 14 AC $4 000.00 $56,000.00 <br /> 2 <br /> Clearing and Grubbing 4.5 AC $3 500.00 $15,750.0 <br /> 3 Gravel for Driveways 300 TN .00 $9,000. <br /> 4 A alt O n Cut and Patch 550 SY $50.00 $27,500. <br /> 5 Concrete Open Cut and Patch 100 SY $90.00 $9,000.0 <br /> Item A Sub-total $117,250.001 <br /> 6 8"PVC SDR 21 Forcemain 1,200 LF 35.00 $42,000.0 <br /> 7 8"90 ree Bend 1 EA $1.060.00 $1.050.0 <br /> 8 8"22.5 a Bend 4 EA $1 050.00 .200.00 <br /> 9 8"Isolation Valve 1 EA $1600.00 $1,600.00 <br /> 10 12"PVC SDR 21 Forcemain 18000 LF $40.00 $720.000.001 <br /> 11 12"Restrained Joint D.I.P. 600 LF $70.00 $42,000.001 <br /> 12 16"ID HOPE DR 9 Installed by Directional Bore 6 EA 32500-00 195 000.00 <br /> 13 12"90 Dearee Bend 0 EA $1.100.00 $0.00 <br /> 14 12'45 Dawee Bend g24 EA $1 050.00 5 200.00 <br /> 15 12"22.5 De Bend EA $1 080.00 $10 800.16 12'Isolation Valve EA $1 650.00 14 850. <br /> 17 Isolation Restraint Joint LF $90 $36.000.00 <br /> 18 lCombination Air Release Valve Assembly in Manhole 4 EA $6,000.00 $20,000. <br /> 19 Tie to Existing Manhole 1 EA $4,400.00 $4,400.00 <br /> Item B Sub-total $1,117,100.001 <br /> 20 8"D.I.P.Class 52 Gravity Sewer 6'-10' 295 LF $70.00 $20.650.001 <br /> 21 10"PVC SDR 35 Gra Sewer 6'-10 4,025 LF $40.00 $161 000.0 <br /> 22 10"PVC SDR 35 Gravity Sewer 10'-14' 0 LF $50.00 $0.00 <br /> 22 10"D.I.P.Class 52 Gravity Sewer 6'-10 100 LF $75.00 $7,500. <br /> 23 10"D.I.P.Class 52 Gravity Sewer 10'-12' 200 LF $80.00 $16,000-00 <br /> 24 10"D.I.P.Class 52 Gravity Sewer 12'-14' 0 LF $85.00 $0.00 <br /> 25 10"D.I.P.Class 52 Gra Sewer 14'-16' 250 LF $95.00 $23,750.00 <br /> 26 10"D.I.P.Class 52 Gravity Sewer 16'-18' 0 LF $110.00 $0.00 <br /> 27 10"O.I.P.Class 52 Gravity Sewer 18'-20' 0 LF $140.00 <br /> 27 10"D.I.P.Installed In Casino 200 LF $80.00 $16.000.0 0 <br /> 28 12"PVC SDR 35 Gravity Sewer 6'-10' 0 LF $50.00 $0.00 <br /> 29 12"PVC SDR 35 Graviv Sewer I 0'-1 41 0 LF $75.00 $0.00 <br /> 30 12"D.I.P.Class 52 Gravity Sewer 6'-10' 250 LF $85.00 $21,250-00 <br /> 31 12'D.I.P.Class 52 Gravity Sewer 10'-14' 100 LF $110.00 $11,000. <br /> 32 12"D.I.P.Class 52 Gravity Sewer 14'-18' 310 LF $130.00 $40,300.00 <br /> 33 12"D.I.P.Class 52 Gravity Sewer 18'-22' 0 LF $250.00 $0.00 <br /> 34 1 12"D.I.P.Class 52 Gravity Sewer(27-251 1,078 LF 5290.00 $312,820.00 <br /> 35 12'D.I.P.Class 52 Gravity Sewer(26'-30') 0 LF $350.00 $0.00 <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.