Browse
Search
2014-247 Planning - Hobbs Upchurch Associates for Buckhorn Mebane EDC District Phase II $393,000
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-247 Planning - Hobbs Upchurch Associates for Buckhorn Mebane EDC District Phase II $393,000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2014 12:16:54 PM
Creation date
6/5/2014 12:16:21 PM
Metadata
Fields
Template:
BOCC
Date
5/8/2014
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6h
Document Relationships
R 2014-247 Planning - Hobbs, Upchurch & Associates - Amendment #2 Buckhorn Mebane Phase 2 Extensions
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County—Buckhom Mebane EDD—Phase II <br /> Contract Amendment#2A (REVISED LETTER) <br /> 04-22-14 <br /> Page 3 of 4 <br /> Task 3—Contract Preparation and Biddina; <br /> HUA will prepare all required bid documents and specifications, as per the previous construction <br /> contracts executed as part of the Buckhom-Mebane EED Water and Sewer Extension Project—Phase Ii. <br /> Services for this task shall include: <br /> • Preparation of Bid Documents and Contract Specifications; <br /> • Contract Advertisement Preparation; <br /> • Bidder Coordination; <br /> • Contract Amendment Preparation as required; <br /> • Bid Document Review;and <br /> • Contract Award Recommendation. <br /> Services NOT Included: <br /> Any work not specifically listed in Tasks 1-3 above will be performed on an hourly basis in accordance <br /> with HUA's most current hourly Fee Schedule at the time services begin, or on a basis to be negotiated <br /> prior to accomplishment of the work, should the services be requested by the OWNER or if additional <br /> design is required by a regulatory or other governmental authority. Items which are not included in this <br /> fee proposal from HUA include, but are not limited to,the following: <br /> • Utility design other than water service to the pump station, sanitary sewer, and electrical for the pump <br /> station; <br /> • Tree surveys; <br /> • Floodplain modeling/analysis; <br /> • Environmental impact study/statement; <br /> • Wetland delineation and wetland agency coordination/concurrence,as done through subcontractor; <br /> • Impact fees; <br /> • Permit fees(including but not limited to railroad encroachment fees and geotechnical report fees); <br /> • Submittal review fees; <br /> • Land acquisition fees; <br /> • Traffic impact studies and traffic improvements; <br /> • Structural design(i.e.walls, buildings, bridges, box culverts), irrigation design and lighting design. <br /> Summary of Contract Amendment NA <br /> The final project will have one pump station and three times the gravity sewer lines as well as opening <br /> developable land north of the railroad in Efland plus property on both sides of 1-40/1-85 Interstate. With an <br /> estimated cost of$4.8 Million, the amended final project will benefit greatly the Mebane-Efland Corridor <br /> as well as all of Orange County. <br />
The URL can be used to link to this page
Your browser does not support the video tag.