Orange County NC Website
Orange County—Buckhom Mebane EDD—Phase 11 <br /> Contract Amendment#2A (REVISED LETTER) <br /> 0422-14 <br /> Page 2 of 4 <br /> as provides gravity sewer north of the Norfolk Southern Railroad for Efland and developable land on the <br /> north and south sides of 1-40/1-85. <br /> Detailed Scope of Services-Cost Estimates <br /> Therefore, we propose to amend the original contract dated November 4, 2010, and prior approved <br /> amendments,to add additional surveying services;final engineering design; and bidding process through <br /> the contract award phase of this project. <br /> Once the actual construction award is established, then the construction management and inspection <br /> phase will be determined. Also, the geotechnical fees and wetlands delineation fees will be included as <br /> "not to exceed"fees(Exhibit C: Opinion of Probable Cost). <br /> Following are the specific cost estimates for this Contract Amendment#2A including: <br /> Expanded Sewer Analysis: $ 46,000.00 <br /> Engineering Design/Surveying(ROW Acquisition): $317,000.00 <br /> Geotechnical Report Fees(NTE): $ 20,000.00 <br /> Wetlands Delineation Fees(NTE): $ 10,000.00 <br /> The above fees supersede those contained in Contract Amendment#2. <br /> Detailed Scope of Services-Task List <br /> The detailed scope of services Task List is defined as follows: <br /> Task 1-Destan Survey and Construction Documents: <br /> Detailed design will include all the proposed forcemain, gravity sewer, and lift station design and site <br /> work. The lift station site will be designed similarly to the Brookhollow Pump Station to provide <br /> consistency for Mebane. A third-party electrical engineer will be subcontracted by HUA for the lift station <br /> design. <br /> • Additional Surveying-as required, based on the new, approved alignment, as shown in the attached <br /> Figure 2; <br /> • 30%Detailed Design Submission to County(Alignment); <br /> • 60%Detailed Design Submission to County(Profiles); <br /> • 90%Detailed Design Submission to County(Final). <br /> Task 2-Coordlnedon and Approvals: <br /> HUA will coordinate with State agencies,local agencies,and utility companies for all approvals necessary <br /> to construct the West Ten Pump Station project as defined by the amended project scope. The <br /> anticipated coordination will be as follows: <br /> • Monthly/131-Monthly Project Meetings as required; <br /> • Orange County Project Coordination; <br /> • Geotechnical Engineer Coordination; <br /> • Environmental Consultant Coordination; <br /> • Cultural / Archaeological Survey Coordination with North Carolina State Historic Preservation Office <br /> (SHPO)and Orange County; <br /> • NCDENR Submissions and Permit Acquisition for: <br /> o Erosion and Sedimentation Control, <br /> o Sanitary Sewer and Lift Station; <br /> • Easement Map Preparation and Survey; <br /> • Shallow Utility Company Coordination; <br /> • Railway Crossing Submission and Coordination;and <br /> • NCDOT Crossing Submission and Coordination. <br />