Browse
Search
Minutes 03-11-2014
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
2010's
>
2014
>
Minutes 03-11-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2014 4:52:44 PM
Creation date
6/4/2014 4:48:29 PM
Metadata
Fields
Template:
BOCC
Date
3/11/2014
Meeting Type
Work Session
Document Type
Minutes
Document Relationships
Agenda - 03-11-2014 - Agenda
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2014\Agenda - 03-11-2014 - Work Session
Agenda - 03-11-2014 - 1
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2014\Agenda - 03-11-2014 - Work Session
Agenda - 03-11-2014 - 2
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2014\Agenda - 03-11-2014 - Work Session
Agenda - 03-11-2014 - 3
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2014\Agenda - 03-11-2014 - Work Session
Agenda - 03-11-2014 - 3 CIP
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2014\Agenda - 03-11-2014 - Work Session
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- Smoke Detection <br /> • Option B" <br /> - Community Center <br /> - Preservation of Wings <br /> - Programmed Use <br /> - Septic Upgrade <br /> "Base" Project: Community Center, Remove Wings <br /> Preliminary Cost Estimate <br /> General Conditions $172,712 <br /> Selective Abatement & Deconstruction $294,881 <br /> Building Renovation $1,029,247 <br /> Site Work $253,255 <br /> Construction Subtotal $1,577,383 <br /> Contingency 8% $105,930 <br /> Professional Fees $173,500 <br /> Cultural & Archaeology Study $5,000 <br /> Construction Testing & Inspections $15,774 <br /> Permits & Fees $2,000 <br /> Audio Visual Equipment $20,000 <br /> Signage $3,500 <br /> Furniture, Fixtures &Equipment $94,643 <br /> Project Total $1,997,730 <br /> Option B— Fully Programmed Space. <br /> The cost to convert the wings to fully programmed space involves major investments in the <br /> septic system upgrade to allow for the additional required wastewater flow as well as the <br /> interior space upfit (to include an expansion of the proposed Community Center HVAC system) <br /> that would provide comfortable office, meeting and services areas necessary for <br /> programmable space. <br /> Septic Upgrade: MBAJ Architects and their engineering sub-consultants reviewed the <br /> construction documents and state that the system as designed is adequate for up to 7,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.