Orange County NC Website
- Smoke Detection <br /> • Option B" <br /> - Community Center <br /> - Preservation of Wings <br /> - Programmed Use <br /> - Septic Upgrade <br /> "Base" Project: Community Center, Remove Wings <br /> Preliminary Cost Estimate <br /> General Conditions $172,712 <br /> Selective Abatement & Deconstruction $294,881 <br /> Building Renovation $1,029,247 <br /> Site Work $253,255 <br /> Construction Subtotal $1,577,383 <br /> Contingency 8% $105,930 <br /> Professional Fees $173,500 <br /> Cultural & Archaeology Study $5,000 <br /> Construction Testing & Inspections $15,774 <br /> Permits & Fees $2,000 <br /> Audio Visual Equipment $20,000 <br /> Signage $3,500 <br /> Furniture, Fixtures &Equipment $94,643 <br /> Project Total $1,997,730 <br /> Option B— Fully Programmed Space. <br /> The cost to convert the wings to fully programmed space involves major investments in the <br /> septic system upgrade to allow for the additional required wastewater flow as well as the <br /> interior space upfit (to include an expansion of the proposed Community Center HVAC system) <br /> that would provide comfortable office, meeting and services areas necessary for <br /> programmable space. <br /> Septic Upgrade: MBAJ Architects and their engineering sub-consultants reviewed the <br /> construction documents and state that the system as designed is adequate for up to 7,000 <br />