Orange County NC Website
Commissioner Dorosin asked if there is a legal obligation to continue allocating this <br /> bond money to this project. <br /> Commissioner Gordon said the Board has an ethical obligation, since the voters voted <br /> for this bond. She said there were some rough patches with financing, and therefore some <br /> Lands Legacy funding was deferred; but she feels there is still an ethical obligation to come <br /> through with this funding. <br /> Commissioner Dorosin said there is not a legal obligation. <br /> Commissioner Gordon said there is not a legal obligation with any bond, but there is an <br /> ethical obligation. <br /> Paul Laughton said the increase to the Eubanks Road Convenience Center <br /> improvements will bring the total cost to $2.4 million. He said much of this is dealing with the <br /> moving of the scale house operations and the associated site improvements. He said this <br /> includes extension of water and sewer, additional storm water structures, 2 additional <br /> compactors and a larger household hazardous waste building. <br /> Paul Laughton referred to the Sportsplex improvements. He said there are details in <br /> the abstract that present some compelling revenue numbers. He said phase 1 would be done <br /> in 2014/15, moving right into phases 2 and 3 in year 2. He said the cost is the same, with <br /> $950,000 for the first phase and $2.8 million for the next two phases. <br /> He referred to the changes to schools. He said the move back for the middle school is <br /> related to the addition of the Culbreth science wing. He said the Cedar Ridge High School <br /> addition was put in the plan for discussion, but the SAPFO numbers say this is not needed <br /> until 2022-23. <br /> Paul Laughton reviewed the new projects slide. He said the Main Library remodel <br /> focuses on upfits to four main areas. He said one immediate need is that some of the shelving <br /> units have height and safety issues. He said this may be seen in the recurring capital library <br /> budget for next year. He said this is an $11,000 project. <br /> Commissioner Gordon asked why this new library would need remodeling. <br /> Paul Laughton said this was based on a study that identified four areas for re-design. <br /> He said this is outlined on page 26 of the CIP. He read some of this language. <br /> Paul Laughton said the Historic Rogers Road Community Center infrastructure is <br /> $3,025,000 allocated in year 2. <br /> Commissioner Dorosin asked about the ADA improvements and whether these <br /> improvements are scattered sites. <br /> Jeff Thompson said there are five or six different buildings funded in the CIP for this. <br /> Commissioner Price asked if there is a way of collapsing the timeframe to be ADA <br /> compliant <br /> Jeff Thompson said a lot of the ADA issues are not code requirements, but they are <br /> convenience requirements <br /> Commissioner Price asked if this can be moved up in the CIP. <br /> Paul Laughton said a lot of these items are small funding amounts. He said the total <br /> for a ten year project is only $175,000. <br /> Chair Jacobs agreed with a shorter time frame. He said he brings this up every year. <br /> Paul Laughton noted an increase to the Efland Sewer project, based on design <br /> changes. He said the economic development utility extension project has $250,000 allocated <br /> in year 1 and year 2 as a placeholder for projects being considered but not finalized. He said if <br /> no project develops, this money would be rolled into future years to be used as needed. <br /> He referred to the appendices section of the document and said the first section on <br /> page 108 separates out the general funds and debt capacity. He said this plan remains under <br /> the 15 percent debt capacity throughout the 5 year CIP period and then reaches 15.44 percent <br />