Browse
Search
Minutes 03-11-2014
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
2010's
>
2014
>
Minutes 03-11-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2014 4:52:44 PM
Creation date
6/4/2014 4:48:29 PM
Metadata
Fields
Template:
BOCC
Date
3/11/2014
Meeting Type
Work Session
Document Type
Minutes
Document Relationships
Agenda - 03-11-2014 - Agenda
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2014\Agenda - 03-11-2014 - Work Session
Agenda - 03-11-2014 - 1
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2014\Agenda - 03-11-2014 - Work Session
Agenda - 03-11-2014 - 2
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2014\Agenda - 03-11-2014 - Work Session
Agenda - 03-11-2014 - 3
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2014\Agenda - 03-11-2014 - Work Session
Agenda - 03-11-2014 - 3 CIP
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2014\Agenda - 03-11-2014 - Work Session
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�i Cedar Grove Center -wings <br /> Stressed Asset <br /> Environment & Agriculture Center <br /> Stressed Asset - EAC <br /> i Original construction 1960s i County acquisition and renovation - 1980s <br /> �i Fully depreciated <br /> �i Requires - $1,433,000 investment for roof, HVAC and/or parking area improvements/ <br /> replacements <br /> �i Would require additional - $80/square foot if existing spaces are upfit for other uses (� <br /> 10,960 assignable square feet available) - approximate cost of$876,800 <br /> EAC Options <br /> �i Current occupancy- assignable square feet <br /> EAC Options <br /> i "Status Quo" - existing use and/or occupants <br /> Requires HVAC, roof, parking investments <br /> �i Convert remainder of facility to conditioned storage <br /> Requires HVAC, roof investments <br /> �i Relocate occupants and storage and divest property and structures (may include ES <br /> sub-station and former car wash building) <br /> �i Relocate occupants and storage, deconstruct/demolish structures and divest property <br /> Jeff Thompson said a lot of this information is not in the CIP, but this conversation and <br /> the Board direction will allow staff to feed that CIP discussion. <br /> Wayne Fenton referred to slide 3 and said the gross square footage is the exterior <br /> measurement of the building, so it is not all useable space. He said this report focuses on <br /> what can be assigned to departments for their use. <br /> Commissioner Dorosin asked how a building can be stressed and underutilized. <br /> Wayne Fenton said stressed means the building is fully depreciated and has <br /> improvements that exceed its value. He said the underutilized status means the number of <br /> people for the square footage is lower than it would ideally be if the renovations were done. <br /> Commissioner McKee said the current occupants of the Environment and Agriculture <br /> Center (EAC) are happy with their location and would like to remain there. He said if the <br /> building is underutilized, then more people need to be put in the space, rather than writing it <br /> off. <br /> Wayne Fenton said the HVAC improvements are required, and the entire system has <br /> aged out. <br /> Commissioner Gordon asked what space in the EAC building would be converted to <br /> storage if occupants stay there. <br /> Wayne Fenton said the goldenrod colored area on the blueprint is the current <br /> conditioned storage. He said if the status quo option is followed, this would be left as is. <br /> Commissioner Dorosin said the suggestion was about turning the whole space into <br /> conditioned storage. <br /> Commissioner Gordon said if the EAC is underutilized, it can either be used for more <br /> storage or more people. <br />
The URL can be used to link to this page
Your browser does not support the video tag.