Orange County NC Website
15 <br /> The Proposed Utility District above is broken down between Water and Sewer Costs. <br /> The Total Cost of the proposed Utility District is outlined below: <br /> Proposed Utility District <br /> Total Water and Sewer Cost <br /> Construction Cost $ 11,226,913 <br /> Engineering, Design and Permitting 10% $ 1,122,691 <br /> Construction Administration 5% $ 561,346 <br /> Construction Inspection 5% $ 561,346 <br /> 20%Contingency $ 2,694,459 <br /> Sub Total $ 16,166,755 <br /> Service Availability Fees $ 1,414,908 <br /> Meter Cost $ 26,400 <br /> Total $ 17,608,063 <br /> Cost Per Parcel (220) $ 80,037 <br /> The Sewer only cost estimate is outlined below and shown on Exhibit 3 (Sewer Map). <br /> Existing OWASA-owned public sewer is shown in thin green lines. The Proposed Utility <br /> District for sewer infrastructure is shown with a thick red line with black dots, <br /> representing the manholes for the new extension. <br /> Proposed Utility District <br /> Total Sewer Cost <br /> Construction Cost $ 7,441,188 <br /> Engineering, Design and Permitting 10% $ 744,119 <br /> Construction Administration 5% $ 372,059 <br /> Construction Inspection 5% $ 372,059 <br /> 20%Contingency $ 1,785,886 <br /> Sub Total $ 10,715,311 <br /> Service Availability Fees $ 973,500 <br /> Total $ 11,688,811 <br /> Number of parcels served 220 <br /> Cost Per Parcel $ 53,131 <br /> 9 <br />