Orange County NC Website
VOLKERT <br /> an extensive and comprehensive public involvement program with over 80 public <br /> engagement meetings. The was a complete streets project which including street <br /> widening, streetscapes,transit stops, river access,greenways, railroad crossings, <br /> pedestrian bridge, roundabouts, bike lanes,on-street parking,and utility upgrade. <br /> Piedmont Authority for Regional Transportation Park and Ride Lots, Triad Area, <br /> North Carolina (2008—2009): Mr. Snow served as the project manager on the project. <br /> The project involved client coordination, development of environmental documentation <br /> (categorical exclusions), construction administration, and Federal Transit Administration <br /> coordination for four park and ride lots in Lexington,Greensboro,Thomasville, Mount Airy, <br /> and Burlington. <br /> R-2514 U.S. 17 Jacksonville to New Bern, Onslow and Jones Counties, North <br /> Carolina (1995 — 2012): Mr. Snow served as the project director on the project. The <br /> project involves the design of roadway alternatives, alternative comparisons, the <br /> preparation of an environmental impact statement (EIS)/Section 4(f), and preliminary <br /> roadway designs for the widening of U.S. 17 from north of Jacksonville to south of New <br /> Bern in Onslow and Jones counties (approximately 22 miles). The project included the <br /> widening of existing segments along with numerous bypass alternatives around the towns <br /> of Belgrade, Maysville, and Pollocksville. The facility is planned as a 4-lane, divided high- <br /> speed roadway with full and partial control of access. The project also involved <br /> environmental justice, community impacts, noise, air quality, hydraulic analysis, <br /> archaeology, historical properties,water quality,erosion control,wetlands,and preliminary <br /> roadway designs, as well as an extensive public involvement program, which includes a <br /> toll-free hotline,newsletter,numerous small citizen group meetings,and public workshops. <br /> Additional Environmental Documents (1988 — 2002): Mr. Snow served as Project <br /> Manager or Project Engineer on the following projects where he authored environmental <br /> documentation: <br /> • US 64 EIS,Tarboro to Robersonville, Edgecombe and Martin Counties, NC <br /> • US 78 EA/FONSI,Aiken to Bamberg,Aiken, Barnwell,and Bamberg Counties, SC <br /> • US 78 Aiken Bypass EA/FONSI,Aiken County, SC <br /> • North Rhett Avenue Widening EA/FONSI, Berkeley County, SC <br /> • US 21 Widening EA/FONSI,Talladega County,AL <br /> Prolect Experience - Roadway, Sfdnin_g, Traffic Control, and Pavement <br /> Marking Desh n <br /> 8 <br />