Browse
Search
Agenda - 06-03-2014 - 7g
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 06-03-2014 - Regular Mtg.
>
Agenda - 06-03-2014 - 7g
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2015 2:43:17 PM
Creation date
5/30/2014 3:35:18 PM
Metadata
Fields
Template:
BOCC
Date
6/3/2014
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7g
Document Relationships
Minutes 06-03-2014
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
RES-2014-039 Resolution Approving the Reconfiguration of Orange County's Priority Transportation Projects for TARPO Regional Priority List for 2016-2022 Statewide Trans Imp Program
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2010-2019\2014
RES-2014-040 Resolution Approving the Reconfiguration of Orange County's Priority Transportation Projects for DCHC MPO Regional Priority List for 2016-2022 Transportation Imp Program
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2010-2019\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY <br />BOARD OF COMMISSIONERS <br />ACTION AGENDA ITEM ABSTRACT <br />Meeting Date: June 3, 2014 <br />Action Agenda <br />Item No. 7 -g <br />1 <br />SUBJECT: Orange County's Reprioritization of Transportation Projects for the Durham - <br />Chapel Hill - Carrboro Metropolitan Planning Organization and the Triangle Area <br />Rural Planning Organization <br />DEPARTMENT: Planning and Inspections PUBLIC HEARING: (Y /N) No <br />ATTACHMENT(S): <br />1. Resolution Reprioritizing Order of <br />Projects for TARPO Regional <br />Priority List <br />2. TARPO Project List Map <br />3. TARPO Project Order <br />Reconfiguration Recommendations <br />4. Resolution Reprioritizing Order of <br />Projects for DCHC MPO Priority <br />List <br />5. DCHC MPO Project List Map <br />6. DCHC MPO Project Order <br />Reconfiguration <br />Recommendations <br />INFORMATION CONTACT: <br />Bret Martin, Transportation Planner, 919 - 245 -2582 <br />Tom Altieri, Comprehensive Planning Supervisor, <br />919- 245 -2575 <br />Craig Benedict, Planning and Inspections Director, <br />919- 245 -2585 <br />PURPOSE: To consider two (2) resolutions (Attachments 1 and 4) reconfiguring two (2) priority <br />lists of transportation projects within the Durham - Chapel Hill - Carrboro Metropolitan Planning <br />Organization (DCHC MPO) and the Triangle Area Rural Planning Organization ( TARPO) <br />planning areas for consideration of inclusion in the 2016 -2022 Statewide Transportation <br />Improvement Program (STIP). <br />BACKGROUND: At the BOCC's November 19, 2013 meeting, the BOCC considered and <br />approved two (2) lists of priority transportation projects incorporating all modes to submit to <br />TARPO and the DCHC MPO for the portion of Orange County within those organizations' <br />respective planning areas. Those lists were subsequently submitted to each transportation <br />planning organization for each organization's submission of projects to the State for scoring. It <br />was determined at the November 19, 2013 meeting by the BOCC that the transportation priority <br />lists for TARPO and the DCHC MPO should be revisited upon receipt of the State scores for <br />each project to evaluate whether the projects should be reprioritized with the benefit of knowing <br />their respective scores. <br />The lists that were considered for approval /endorsement by the BOCC were meant to serve two <br />roles: <br />
The URL can be used to link to this page
Your browser does not support the video tag.