Browse
Search
Agenda - 06-03-2014 - 7d
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 06-03-2014 - Regular Mtg.
>
Agenda - 06-03-2014 - 7d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2015 4:24:04 PM
Creation date
5/30/2014 3:17:16 PM
Metadata
Fields
Template:
BOCC
Date
6/3/2014
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7d
Document Relationships
Minutes 06-03-2014
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
RES-2014-038 Resolution Amending Joint Planning Land Use Plan and Joint Planning Agreement to Allow for the Possibility of Locating Appropriate Agricultural Support Enterprises in the Rural Buffer Land Use Classification
(Message)
Path:
\Board of County Commissioners\Resolutions\2010-2019\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 5: Uses 70 <br />Section 5.13: Standards for Agricultural Uses <br />(8) Application materials shall include a comprehensive groundwater study, for <br />facilities expected to use more than 240 ^ ^'r^ groundwater <br />ef4et -area on an annual basis than an average single family residence (which <br />uses 240 gallons of water per day) built at the highest density the existing zoning <br />district would allow. For example, if the existing zoning district allows a <br />residential density of 1 unit for 2 acres and the proposed use is on a six acre <br />parcel (which could yield 3 residences), the proposed use(s) may use three times <br />the water used by an average single family residence (or 720 gallons per day, on <br />an annualized basis) before a comprehensive groundwater study is required. <br />The water usage rates of any existing use subject to zoning regulations located <br />on the same lot shall be taken into account when determining if a comprehensive <br />groundwater study is required. Said study shall detail: <br />(a) The amount of water anticipated to be used on a daily, weekly, monthly, <br />and annual basis by regulated uses located on the parcel (e.g., water <br />usage by bona fide farm uses is not required to be included); <br />(b) An analysis of the amount of groundwater withdrawal considered to be <br />safe and sustainable in the immediate vicinity; and <br />(c) An analysis of whether other wells in the vicinity of the proposed use wi(I <br />are expected to be affected by withdrawals made by the proposed use. <br />5.13.7 Cooperative Farm Stand <br />(A) General Standards for Evaluation <br />Materials presented <br />{1) ----- <br />at public hearing <br />farm GfG,ne Of the GGepeFative for.., partners 27 <br />showed "or RB" as <br />part of proposed <br />(2) 28 In addition to the application materials required in Sections 2.5.2 and 2.4.3, the <br />amendment. <br />following shall also be required: <br />Proposed standard <br />(a) The number of and location of participating cooperative farm partners. <br />#1 has been <br />designated for <br />(b) A description of the facility, including size of structure(s) and access <br />deletion at the <br />locations. <br />direction of the <br />(c) Number of employees, if any. <br />County Attorney's <br />office due to issues <br />(d) Frequency and hours of operation. <br />of legal sufficiency <br />(3) Sales of any products not produced on the farm(s) of one of the cooperative farm <br />related to bona fide <br />partners shall be incidental, related to, and a subordinate component of farm <br />farms. <br />stand sales in scale and profit. <br />5.13.8 Equestrian Center <br />(A) Standards for Class A Special Use Permit or ASE -CZ Zoning District <br />(1) Minimum lot size: 15 acres. <br />(2) Site shall have direct access to a major road, as classified in the Orange County <br />Comprehensive Plan, and shall use said road as the primary access, unless <br />approved otherwise in the permit. <br />(3) All structures, facilities, storage areas, and parking areas shall be setback a <br />minimum of 100 feet from all property lines. <br />27 The County Attorney's office has advised that this standard is legally insufficient and must be removed. Removal <br />of this standard means that within the AR zoning district, a cooperative farm stand can be located, subject to <br />standards, on parcels that are not considered bona fide farms. <br />28 Renumbering will autornatically occur after (1) is removed. <br />Orange County, North Carolina — Unified Development Ordinance Page 5 -123 <br />
The URL can be used to link to this page
Your browser does not support the video tag.