Orange County NC Website
Owner: <br />Orange County <br />Attn: Jeff Thompson <br />P.O. Box 8181 <br />Hillsborough, NC 27278 <br />Contractor: <br />Riggs- Harrod Builders, Inc. <br />1117 East Geer Street <br />Durham, NC 27707 <br />8. MISCELLANEOUS <br />a. Duties and Obligations imposed by the Contract Documents shall be in addition to any Duties <br />and Obligations imposed by state, federal or local law, rules, regulations and ordinances. <br />b. No act or failure to act by the Owner or Contractor shall constitute a waiver of any right or <br />duty granted them under the Contract Documents, nor shall any act or failure to act constitute <br />any approval except as specifically agreed in writing. <br />The Work shall be tested and inspected as required by the Contract Documents and as required <br />by law. Unless prohibited by law the costs of all such tests and inspections related to state and <br />federal codes such as ADA, Administrative, Electrical, Plumbing, Mechanical and Building <br />Codes shall be borne by the Contractor. The costs for material and structural testing shall be <br />conducted by an independent third party at the expense of the Owner. Delays related to any of <br />the aforementioned tests and inspections shall not be grounds for delaying the completion of <br />the work. If any such tests and inspections reveal deficiencies in the Work such that the Work <br />does not comply with terms or requirements of the Contract Documents and /or the <br />requirements of any code or law the Contractor is solely responsible for the cost of bringing <br />such deficiencies into compliance with the terms of the Contract Documents and /or any code <br />or law. <br />d. Should the Designer, if a Designer is retained for the project involving the Work, or Owner <br />reject any portion of the Work for failing to comply with the Contract Documents Contractor <br />shall immediately, at Contractor's expense, correct the Work. Any such rejection may be <br />made before or after substantial completion. If applicable, any additional expense borne by the <br />Designer under this section shall be paid at Contractor's expense. <br />e. The Contractor shall not assign any portion of this Agreement nor subcontract the Work in its <br />entirety without the prior written consent of the Owner. <br />9. CONSEQUENTIAL DAMAGES <br />a. Owner and Contractor mutually waive any claim against each other for consequential damages. <br />Consequential Damages include: <br />(i) Damages incurred by Owner for loss of use, income, financing, or business. <br />(ii) Damages incurred by Contractor for office expenses, including personnel, loss of <br />financing, profit, income, business, damage to reputation, or any other non - direct <br />damages. <br />10. ENTIRE AGREEMENT <br />All of the documents listed, referenced or described in this Agreement, the written Notice -to- Proceed, <br />together with Modifications made or issued in accordance herewith are the Contract Documents, and the work, <br />labor, materials and completed construction required by the Contract Documents and all parts thereof is the <br />Revised 1/14 5 <br />