Browse
Search
Agenda - 06-03-2014 - 7b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 06-03-2014 - Regular Mtg.
>
Agenda - 06-03-2014 - 7b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2015 2:38:31 PM
Creation date
5/30/2014 3:12:10 PM
Metadata
Fields
Template:
BOCC
Date
6/3/2014
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7b
Document Relationships
Minutes 06-03-2014
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 2 <br />NORTH CAROLINA <br />[Departmental Use Only] <br />TITLE Sportsplex Lobby <br />FY FY2013 -14 <br />CONSTRUCTION AGREEMENT OVER $250,000.00 <br />ORANGE COUNTY <br />0 <br />THIS CONSTRUCTION AGREEMENT (hereinafter called "Agreement "), made as of the 3rd day of <br />June, 2014, by and between Riggs - Harrod Builders, Inc., (hereinafter called the "Contractor "), and Orange <br />County, a body politic and a political subdivision of the State of North Carolina, (hereinafter called the <br />"Owner "). <br />WITNESSETH: <br />That the Contractor and the Owner, for the consideration herein named, agree as follows: <br />1. CONTRACT DOCUMENTS; PRIORITY <br />The Contract Documents consist of this Agreement, the General Conditions which are fully <br />incorporated in this Agreement, the Request for Proposals, designer approved communications and/or field <br />orders, the Proposal, Construction Documents and Drawings and Written Specifications. The Contract <br />Documents form the Contract. In the event of any inconsistency between or among the Contract Documents <br />the Contract Documents shall be interpreted in the following order of priority: <br />a. This Agreement with incorporated General Conditions. <br />b. Designer approved and stamped construction documents and drawings and written <br />specifications. <br />c. Designer approved communications and /or field orders. <br />d. Request for Proposals and addenda thereto. <br />e. Proposal. <br />2. SCOPE OF WORK <br />The Contractor shall furnish and deliver all of the materials, and perform, and be fully responsible <br />for all of the Work required by this Agreement within the time period stipulated in a written Notice -to- Proceed <br />to be executed by the Contractor and Owner and in accordance with the following enumerated documents, <br />which are made a part hereof as if fully contained herein: <br />a. Construction Drawings prepared by Burke Design (Sheet Index dated November 20, 2013, <br />Project Manual dated March 24, 2014 and Addendums #1, #2, and #3 described in Attachment <br />1 dated April 7, 2014 for addendum #1; April 14, 2014 for addendum #2; and April 17, 2014 <br />for addendum #3) <br />b. Written specifications prepared by the Designer. <br />c. Contractor Bid proposal dated April 24, 2014 described in Attachment 2 which fully describes <br />the work to be performed, such work (hereinafter called the "Work "). <br />d. Related documents listed under Section 2 above. <br />Revised 1/14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.