Browse
Search
Agenda - 06-03-2014 - 7a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 06-03-2014 - Regular Mtg.
>
Agenda - 06-03-2014 - 7a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2015 2:38:26 PM
Creation date
5/30/2014 3:10:55 PM
Metadata
Fields
Template:
BOCC
Date
6/3/2014
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7a
Document Relationships
2014-293 County Manager - OWASA - Interlocal Agreement for Rogers Road Area Extension of Wastewater System Improvements
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2014
Minutes 06-03-2014
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13 <br />Attachment 5 <br />NORTH CAROLINA <br />ORANGE COUNTY <br />INTERLOCAL AGREEMENT <br />RELATING TO OWASA'S ASSISTANCE TO ORANGE COUNTY IN PLANNING FOR <br />EXTENSION OF WASTEWATER SYSTEM IMPROVEMENTS TO SERVE THE <br />ROGERS ROAD AREA <br />This Interlocal Agreement for the preliminary engineering for a wastewater system <br />project in the Rogers Road Area is dated as of , 2014, and is entered into by and <br />between Orange Water and Sewer Authority (hereinafter OWASA), an authority organized under <br />Chapter 162A, North Carolina General Statues, and the County of Orange (hereinafter County), <br />organized under Chapter 153A of the North Carolina General Statues. <br />WHEREAS, the County desires at its expense to begin planning for the provision of <br />wastewater system lines and facilities to serve residents located in the Rogers Road area of <br />southern Orange County, herein the "Project," which will be connected to lines in areas already <br />served by OWASA's existing public wastewater collection lines and facilities; and, <br />WHEREAS, the County is to determine the scope of the Project; and <br />WHEREAS, the County desires to obtain OWASA's assistance to obtain preliminary <br />engineering work necessary to determine the scope and predict the costs of this Project, to the <br />end that the Project improvements will be constructed and extended in accordance with <br />OWASA's collection system standards, into which the Project lines will flow; and <br />WHEREAS, OWASA desires and is willing to assist the County with the successful <br />completion of this Project work; <br />NOW, THEREFORE, the parties agree as follows: <br />1. Purpose. The purpose of this Agreement is to establish the financial and other <br />responsibilities of the parties for certain preliminary engineering necessary to determine the <br />
The URL can be used to link to this page
Your browser does not support the video tag.