Orange County NC Website
1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />29 <br />30 <br />31 <br />32 <br />33 <br />34 <br />35 <br />36 <br />37 <br />38 <br />39 <br />40 <br />41 <br />42 <br />43 <br />44 <br />45 <br />46 <br />47 <br />48 <br />49 <br />25 <br />driven by the jail project. He said the SAPFO numbers for the schools drive the needs and <br />capacity decisions. He said the CIP shows many of these in years 6 through 10. He reminded <br />the Board of the capitol funding policy included in the appendices section, which gives a <br />principle target of providing capital funding of 60 percent to schools, and 40 percent to the <br />County over a decade, starting in 2005. He said the County is right at this goal if you look at <br />the 10 year period, with 59.6 percent schools and 40.4 percent County. <br />Paul Laughton said the HVAC chiller is having a lot of problems and there is $150,000 in <br />HVAC to pay for this. He said the total cost is $200,000, but there is $100,000 in available <br />contingency from the Whitted project that can be used. <br />Chair Jacobs said the current chiller has been a problem from the start, and there is an <br />issue in the community with the sound. He suggested that the replacement be vetted for <br />sound. <br />Paul Laughton said the co -build concept for EMS substations with the towns of Chapel <br />Hill and Hillsborough includes a plan to do two buildings in year 2, with a cost of $600,000 per <br />substation. He said this would be one for the town of Chapel Hill and one with the town of <br />Hillsborough. He said this would be done again the next year, followed by two stand alone <br />stations. He said this would include one in year 5 and one in the out years. He said this <br />provides 4 co -built locations and 2 stand - alones, which is a major change. <br />He said the Lands Legacy allocations are $400,000 in year 1 and $2 million in year 2. <br />Commissioner Dorosin asked if the Lands Legacy plan is to spend $2.4 million by 2015- <br />16 buying more land. <br />Paul Laughton said that money would be available. <br />Commissioner Dorosin asked if the money could be given to something else if it is not <br />spent. <br />Paul Laughton said that would be a decision for the Board, but the people approved this <br />bond for use with Lands Legacy. He said this lapsed in 2010, and it will require refinancing and <br />re- funding if it is the desire of the Board. <br />Commissioner Dorosin asked if there is a legal obligation to continue allocating this <br />bond money to this project. <br />Commissioner Gordon said the Board has an ethical obligation, since the voters voted <br />for this bond. She said there were some rough patches with financing, and therefore some <br />Lands Legacy funding was deferred; but she feels there is still an ethical obligation to come <br />through with this funding. <br />Commissioner Dorosin said there is not a legal obligation. <br />Commissioner Gordon said there is not a legal obligation with any bond, but there is an <br />ethical obligation. <br />Paul Laughton said the increase to the Eubanks Road Convenience Center <br />improvements will bring the total cost to $2.4 million. He said much of this is dealing with the <br />moving of the scale house operations and the associated site improvements. He said this <br />includes extension of water and sewer, additional storm water structures, 2 additional <br />compactors and a larger household hazardous waste building. <br />Paul Laughton referred to the Sportsplex improvements. He said there are details in the <br />abstract that present some compelling revenue numbers. He said phase 1 would be done in <br />2014/15, moving right into phases 2 and 3 in year 2. He said the cost is the same, with <br />$950,000 for the first phase and $2.8 million for the next two phases. <br />He referred to the changes to schools. He said the move back for the middle school is <br />related to the addition of the Culbreth science wing. He said the Cedar Ridge High School <br />addition was put in the plan for discussion, but the SAPFO numbers say this is not needed until <br />2022 -23. <br />