Browse
Search
Agenda - 06-03-2014 - 6a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 06-03-2014 - Regular Mtg.
>
Agenda - 06-03-2014 - 6a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2015 2:37:43 PM
Creation date
5/30/2014 1:00:26 PM
Metadata
Fields
Template:
BOCC
Date
6/3/2014
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6a
Document Relationships
Minutes 06-03-2014
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />• Option B" <br />- Community Center <br />- Preservation of Wings <br />- Programmed Use <br />- Septic Upgrade <br />"Base" Project: Community Center, Remove Wings <br />Preliminary Cost Estimate <br />General Conditions <br />Selective Abatement & Deconstruction <br />Building Renovation <br />$172,712 <br />$294,881 <br />$1,029,247 <br />Site Work $253,255 <br />Construction Subtotal <br />Contingency <br />Professional Fees <br />Cultural & Archaeology Study <br />Construction Testing & Inspections <br />Permits & Fees <br />Audio Visual Equipment <br />Signage <br />$1,577,383 <br />8% $105,930 <br />$173,500 <br />$5,000 <br />$15,774 <br />$2,000 <br />$20,000 <br />$3,500 <br />Furniture, Fixtures &Equipment $94,643 <br />Project Total <br />$1,997,730 <br />Option B — Fully Programmed Space. <br />The cost to convert the wings to fully programmed space involves major investments in the <br />septic system upgrade to allow for the additional required wastewater flow as well as the interior <br />space upfit (to include an expansion of the proposed Community Center HVAC system) that <br />would provide comfortable office, meeting and services areas necessary for programmable <br />space. <br />Septic Upgrade: MBAJ Architects and their engineering sub - consultants reviewed the <br />construction documents and state that the system as designed is adequate for up to 7,000 <br />gallons of daily flow. Full capacity design is estimated not to exceed $800,000, which includes <br />adequate contingency for unforeseen conditions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.