Orange County NC Website
1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />• Option B" <br />- Community Center <br />- Preservation of Wings <br />- Programmed Use <br />- Septic Upgrade <br />"Base" Project: Community Center, Remove Wings <br />Preliminary Cost Estimate <br />General Conditions <br />Selective Abatement & Deconstruction <br />Building Renovation <br />$172,712 <br />$294,881 <br />$1,029,247 <br />Site Work $253,255 <br />Construction Subtotal <br />Contingency <br />Professional Fees <br />Cultural & Archaeology Study <br />Construction Testing & Inspections <br />Permits & Fees <br />Audio Visual Equipment <br />Signage <br />$1,577,383 <br />8% $105,930 <br />$173,500 <br />$5,000 <br />$15,774 <br />$2,000 <br />$20,000 <br />$3,500 <br />Furniture, Fixtures &Equipment $94,643 <br />Project Total <br />$1,997,730 <br />Option B — Fully Programmed Space. <br />The cost to convert the wings to fully programmed space involves major investments in the <br />septic system upgrade to allow for the additional required wastewater flow as well as the interior <br />space upfit (to include an expansion of the proposed Community Center HVAC system) that <br />would provide comfortable office, meeting and services areas necessary for programmable <br />space. <br />Septic Upgrade: MBAJ Architects and their engineering sub - consultants reviewed the <br />construction documents and state that the system as designed is adequate for up to 7,000 <br />gallons of daily flow. Full capacity design is estimated not to exceed $800,000, which includes <br />adequate contingency for unforeseen conditions. <br />