Browse
Search
Agenda - 06-03-2014 - 5a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 06-03-2014 - Regular Mtg.
>
Agenda - 06-03-2014 - 5a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2015 2:37:19 PM
Creation date
5/30/2014 12:58:16 PM
Metadata
Fields
Template:
BOCC
Date
6/3/2014
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5a
Document Relationships
Minutes 06-03-2014
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
20 <br />PUBLIC HEARING DRAFT May 1, 2014 <br />18. The County's Lands Legacy Program has wiped out the parkland deficit identified in 1999, and <br />secured a number of future parks, open spaces and nature preserve sites at strategic locations <br />for future needs. <br />19. The 1988 Master Recreation and Parks Plan served the County well as a blueprint for future <br />needs, and most of the facilities and programs anticipated in that plan have been built, secured <br />or implemented. Many of the basic philosophical and physical tenets of that plan are still valid. <br />However, a solution to a park site for Bingham Township remains to be addressed. <br />20. Opportunities for coordinated school /park planning with the school systems appear to exist. <br />Proposed Recommendations <br />Important Note: These are draft recommendations and are subject to change. <br />1. Enhance and protect our investment in existing park and recreation facilities. <br />2. Build the planned future parks (all planned parks open within 10 years). <br />3. Complete Nature Preserves in a way that provides for public access and <br />recreation. <br />4. County should work with towns, school systems and others to build new facilities. <br />5. In some manner (whether on rural rustic trails or along rural roadways), develop <br />a plan and complete Orange County section of the NC Mountains -to -Sea Trail. <br />6. Build more trails, and connect County /town open spaces and parks with trails? <br />7. Improve access to parks and trails, and design parks for healthy lifestyles. <br />8. Look at new program needs and consider new partnerships. <br />9. Examine the role of community centers in providing recreation, other services. <br />Issues for Further Study <br />• Ultimate Level of Service for the County Parks system. <br />• Review methods of park funding and acquisition. <br />• Coordination between Sportsplex and County programs. <br />• Further examine need for a public pool? <br />• Artificial turf versus natural playing surfaces. <br />• Frequency of surveys and plan updates. <br />Want to view the master plan — or share thoughts and comments online or by email? Go <br />to http : / /0rangecountync..govldeanr /parks master plan.asp and click on the master plan <br />link, or comments link. Email us at deaprc�i.orangecountync.gov or call 919- 245 -2510. <br />
The URL can be used to link to this page
Your browser does not support the video tag.