Browse
Search
Agenda - 06-03-2014 - 5a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 06-03-2014 - Regular Mtg.
>
Agenda - 06-03-2014 - 5a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2015 2:37:19 PM
Creation date
5/30/2014 12:58:16 PM
Metadata
Fields
Template:
BOCC
Date
6/3/2014
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5a
Document Relationships
Minutes 06-03-2014
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13 <br />Orange County Comprehensive Parks and Recreation Wester Plan <br />CHAPTER 1 - Summary of the Plan <br />Recommendations <br />Using the 20 Findings identified in the master plan, <br />and assessing the current status of park planning via <br />the framework of the park system as has been <br />developed over the past 15 years, the Master Plan <br />makes nine recommendations moving forward to <br />the year 2030: <br />Recommendation 1 - Protect and Enhance Invest- <br />ment in Parks and Open Spaces: <br />The County currently operates six parks repre- <br />senting an investment of over $9 million, and has <br />helped fund municipal parks by contributing over <br />$6.5 million to these facilities. Future phases at the <br />six open County parks are planned, and some of the <br />facilities built will begin to age out over time. <br />Operation and maintenance costs are ongoing and <br />critically important to the park experience. The <br />County should continue to protect its investment in <br />the existing parks by funding facility replacement, <br />future phases and operating costs. <br />Recommendation 2 — Build the Planned Future <br />Parks: <br />Because the County has been so proactive in <br />identifying and acquiring future park sites, several <br />future sites have been secured for future use and <br />these new park projects are included in the County's <br />Capital Investment Plan. Orange County should <br />commit to opening the planned new parks as shown <br />in Table 10 -1 within 10 years (by the year 2024), <br />with two of the parks opened within 5 years (by <br />2019). <br />Recommendation 3 — Complete the Protection of <br />Identified Nature Preserves and Create Access <br />Areas and Trails Within the Preserves: <br />Working through the Lands Legacy program and <br />other conservation partners, the County has three <br />identified locations where nature preserves exist or <br />have been started with the possibility of expansion — <br />the Upper Eno preserve, the New Hope Preserve <br />and the Jordan Lake Headwaters Preserve. The <br />primary purpose of these preserves is to protect <br />important natural lands, but opportunities exist — <br />and should be pursued — to provide for public access <br />on the less sensitive portions of the sites through <br />careful site nlannine. <br />Recommendation 4 — Formalize and Build Support <br />Structure for Multi- Partner Capital Facilities: <br />Over the past 16 years, the towns and County have <br />worked together to construct a number of parks and <br />open space areas, primarily County funding toward <br />construction of town -owned and operated facilities. <br />Similarly, the use of school facilities for recreation <br />programs occurs in some locations. Greater <br />opportunities for joint ventures appear both possi- <br />ble and prudent. In some cases, towns are running <br />out of land for new parks, and the County owns <br />parkland nearby. Design of new school facilities <br />could occur with joint use in mind, rather than after <br />the fact. In addition, opportunities with OWASA, <br />state parks and the two local educational <br />institutions (UNC and Duke) appear to exist. All of <br />these parties have mutual interests that may be <br />served by greater collaboration, and the time may <br />have come to make this collaboration more formal. <br />Recommendation 5 — Develop a Master Plan for <br />the Orange County segment of the Statewide <br />Mountains -to -Sea Trail: <br />The Mountains to Sea Trail (MST) is part of the State <br />Parks system and will link Clingman's Dome in the <br />Great Smoky Mountains to Jockey's Ridge on the <br />Outer Banks. While many portions of the trail <br />network have been developed and are in use, the <br />eastern Piedmont segment remains the most <br />complicated due to the need to traverse an area <br />without natural features (rivers) or public lands. The <br />plan for the MST calls for it to enter Orange County <br />at the southwest from the Haw River Trail, and con- <br />nect via Hillsborough into Eno River State Park and <br />thence to Falls Lake. The MST, which in rural areas <br />may be only a natural path a few feet wide, contains <br />a planned segment from OWASA -owned lands <br />around Cane Creek Reservoir to the Upper Eno Pre- <br />serve near Hillsborough. This segment will require <br />careful planning with property owners and utilities. <br />A master plan for the trail is needed to pinpoint the <br />trail's path through this area. A solution should be <br />identified (whether on private lands, public roads or <br />some combination thereof) so that Orange County <br />does not become the gap in the NC MST. <br />. -10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.