Orange County NC Website
• r s <br />Water & Sewer Utilities Capital Projects (REVISED from 5/8/14 BOCC Action) <br />Fiscal Years 2014 -19 <br />Project Name <br />Buckhorn EDD Phase 2 Extension (Efland Sewer to Mebane) <br />Project <br />Functional Service Area <br />Community and Environment <br />Status <br />Approved <br />Department <br />Planning <br />Starting Date <br />71112012 <br />Current <br />Year 1 Year 2 Year 3 Year 4 <br />Completion Date <br />1213012015 <br />Year 5 Five <br />Year 6 <br />Project Budget <br />Prior Years Fiscal Year <br />Funding <br />Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Year <br />to <br />Appropriation <br />2013 -14 <br />2014 -15 2015 -16 2016 -17 2017 -18 <br />2018 -19 Total <br />Year 10 <br />Professional Design Services <br />151,600 241,400 <br />Land /Budding <br />40,000 <br />Construction /Repairs /Renovations <br />- <br />4,300,000 <br />Equipment/Furnishings <br />4,300,000 <br />Total Project Budget <br />151,600 281,400 <br />4,300,000 <br />A ,,,,, , <br />General Fund Related Operating Costs <br />Personnel Services <br />Operations <br />New Debt Service <br />Total Operating Costs <br />Revenues /Funding Source <br />Transfer from General Fund <br />Article 46 Sales Tax - Debt Service <br />Article 46 Sales Tax Proceeds <br />Debt Financing - Article 46 Sales Tax <br />Total <br />Description /Justification <br />151,600 <br />22,512 366,512 <br />22,512 366.512 <br />22,512 366 512 <br />281,400 1 4,300,000 <br />51,600 281 <br />366 <br />512 366,512 366 512 1,488 560 1 1 832,560 <br />366,512 366 512 366,512 1 488,560 I 1 832,560 <br />4,300,000 <br />366,512 366,512 366,512 5,788,560 1 <br />Currently, the wastewater collected by the Efland sewer system is pumped 3 1/2 miles east to the Town of Hillsborough via a 10" force main This project <br />would construct the infrastructure necessary to send the wastewater collected by the existing system (circa 1988 +), the proposed system extension and any <br />future system extensions the opposite direction to the City of Mebane along West Ten Road This fits into a long range strategy to ultimately turn over <br />operation of the Efland sewer system to the City of Mebane based on an interlocal agreement signed in 2012 This project would also construct the force <br />main between the existing Gravelly Hill Pump station and Rock Quarry road which will eventually allow the Gravelly Hill PS (Buckhorn EDD) to be upgraded <br />When completed, the roughly $100 000 annual General Fund contribution necessary to cover the expenses of operating the Efland Sewer System would be <br />eliminated Cost estimates have been revised based on preliminary design data and recent bid prices on related projects The original Professional Design <br />Services estimate for 2012 -2013 has been revised to reflect the actual cost of the design contract approved by the BOCC on 9/6/2012 The estimated <br />construction costs and professional services costs have increased due to revised pricing /design that has taken place in the past several months Note <br />Design and permits to go under the Interstate and Railroad will more than likely take all of FY 2013 -14 to complete Some parts of this project, <br />when completed, may shift to the General Fund as the engineering design and scope of the project are defined UPDATE At the May 8, 2014 <br />regular meeting, the BOCC approved an amendment to the design contract for this project in the amount of $121,400 for FY 2013 -14. <br />W <br />