Orange County NC Website
136 Article 2 Procedures <br />Section 2 3 Comprehensive Plan Amendments <br />prescribed in Section 2 3 2(B), or <br />(D) The Planning Director <br />GIaSSifiGatiGR of Amendments' <br />(B) <br />existing nGde and does not !RGrease its land area by mGre than ten aGres7 <br />235 Public Hearing Required <br />A public hearing shall be held before adoption of any proposed Comprehensive Plan amendment <br />The Board of County Commissioners shall hear applications and receive <br />public comment for proposed Comprehensive Plan amendments iR a QuarteFly Publi^ Hearing at <br />a meeting designated for UDO /Comprehensive Plan- related public hearings Dates for said <br />meetings shall be designated each year in accordance with Section 2 8 12 <br />2 3 6 Notice Requirements for Public Hearings <br />(A) Notice of the public hearing shall be given by publishing said notice at least twice in a <br />newspaper of general circulation in the County, stating the time and place of such <br />hearing and the substance of the proposed amendment <br />(B) This notice shall appear in said newspaper for two consecutive weeks with the first notice <br />appearing not less than ten days nor more than 25 days before the date set for the public <br />hearing In computing the notice period, the day of publication is not to be included, but <br />the day of the hearing is to be included <br />(C) The minimum published size of the notice shall be 25 square inches <br />(D) In the case of amendments to the Land Use Dlan (P;ap) Future Land Use Map2, the <br />Planning Director shall prominently post a notice of the public hearing on the site <br />proposed for the land use change or on an adjacent public street or highway right of way <br />not less than ten days before the date set for the public hearing <br />1 If the proposed text amendments are adopted, public hearings will no longer be held on only a quarterly basis <br />Because of this, the text in Section 2 3 7 (A) (B) and (C) becomes obsolete which means that the text in this section <br />(2 3 4) is effectively no longer relevant Amendments to the Comprehensive Plan could be heard at any of the <br />public hearings that will be designated each year for UDO /Comprehensive Plan- related items Note that all <br />subsequent subsections on 2 3 will be renumbered with the removal of Section 2 3 4 <br />2 The official name of the map was clarified /changed on February 7, 2012 <br />Orange County, North Carolina — Unified Development Ordinance Page 2 -5 <br />