Browse
Search
Agenda - 05-27-2014 - C1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 05-27-2014 - Quarterly Public Hearing
>
Agenda - 05-27-2014 - C1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2015 4:19:07 PM
Creation date
5/16/2014 3:38:39 PM
Metadata
Fields
Template:
BOCC
Date
5/27/2014
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
C.1
Document Relationships
Minutes 05-27-2014
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
95 <br />State of North Carolina <br />Department of Environment and Natural Resources Reviewing Office <br />INTERGOVERNMENTAL REVIEW - PROJECT COMMENTS Project Number, 13 ^ z9Y'1 Due Dale <br />After ravltw of NS project it lies bc:n determined that the ENR perm0(s) and/or approvals Indicated may need to be obtained to order far this project to comply with Norlh <br />Carolina Law Qucstions regarding these permits should be addressed to the Regional Office indicated on the reverse of ]he form. All applications, information and guidehnas <br />reledirc to these plans and permits arc available, from the same Regional Office <br />k <br />Normal Process Time <br />PERMITS <br />SPECIAL APPLICATION PROCEDURES or REQUIREMENTS <br />(statutory lime limit) <br />Permil to construct & operate wastewater trestrien, <br />Application 90 days befam begin construction or award of conatnnnon <br />30 days <br />i f-1 <br />Facilities, server system exicrmons & sewer systems <br />not discharging Into state surface waters. <br />contracts. On -sne impecuen Post application technical conference USUAL <br />(90 days) <br />WIRES - perrnii to discharge into surface watts arid/of <br />Application 180 days before begin atlivity. On site inspection Pro- apphcatron <br />(� <br />permit to operate and c=truet wasmwaier facilities <br />conference usual Additionally obtain permit to construct wastewater <br />o <br />90 -120 days <br />discharging into stab surface waters <br />treatment facility granted after NPDES Reply time 30 days after receipt of <br />(N/Alf <br />plans or Issue of NPDES permit whichever is later <br />t; ] <br />Water Use Permit <br />Pre - application technical conFerence usually necessary <br />! 30 days <br />(NtA) <br />f 1 <br />Wd{ Construction Permit <br />Complete application must be received and permit issued prior to the <br />7 days <br />instadphon of a well <br />(15 days) <br />Apphcabon copy must be served on etch adjacent nparsan property owner <br />�l <br />Dredge and Fill Permit <br />On -site inspection. Pre - application conference usual Filling shay, require <br />55 days <br />t Easement to Fill from N C Department ofAdministmtion and Federal <br />(90 days) <br />Dredge And Fill Pernit. <br />Permit to construct & oaenue Arr Pollution Abatement <br />Application must be submitted find permit recerved prior to <br />tau I(ues antVo, Emission Sources as per l5 A NCAC <br />construction end operation nfthe source. If a permit is required in an <br />90 days <br />(2Q OI00 thru 2Q0300) <br />area without local toning, then there are additional reauirements and <br />umchnes (2Q.0113) <br />i 1 <br />Permit to construct &. optntt Transportation facility as <br />Application must be submitted at least % days prior to construction or <br />90 days <br />per I S A NCAC (2D.0800, 3Q.0601) <br />modification of the source <br />Any open burning associated with subject proposal <br />must be in compliance with t5 A NCAC 20 1900 <br />r <br />Demot(tion or re novations ofstructures Containing <br />..besws material must be to eompliancc with 15 A <br />40 days <br />n <br />"CAC 20 I 1 10 (a) (I ) which requires notification and <br />_ N/A <br />(90 days) <br />t <br />"'novel prior to demolition Contact Asbestos Control <br />- <br />I <br />soup 91 9 707 -5950 <br />l <br />Complex Source Permit required under 15A NCAC <br />2D,0800 <br />The Sedimentation pollution Control Act of 1973 ]Trust be prop•riv addressed for any kind disturbing activity. An trosron <br />sedimentation control plan will be required iforie ear more Letts to be disturbed. Plan filed with proper Regional Office (Land Quality <br />t <br />20 days <br />l <br />Section) At taut 30 days before beginning Acunty A tea of SG$ for the Gar acre or any pan of an Acre An express review action is <br />(30 days) <br />available with additional fees <br />ISedimeniation <br />F l <br />and erosion control must be addressed in accordance with NCDOT's approved program Particular aneation should be given to <br />design ono mSUIl aeon of appropriate perimeter sediment trapping devrces as well As stable stormwater conveyances end outlets. <br />(30 days) <br />On -sift inspection usual Surety bond filed with ENR Bond amount vuries <br />Fm <br />Mining Permit <br />with type mine and number of acres ornfftcted land Any arc mmcd greater <br />30 days <br />iraut one acre must be permitted, 7'hc appropriate bond must be received <br />(60 lays) <br />before the permit can be issued. <br />North Carolina Burning permit <br />On -site inspection by N.0 Division Forest Resources if permit exceeds 4 days <br />I day <br />t <br />I <br />(NIA) <br />Special Ground Clearance Burning Ptm7ii -Z2 <br />On -sne inspection by H C. 0rviston Forest Resources required Yin are than <br />I day <br />n <br />counties in coastal N,C with organic soils <br />five acres ofground clewing activities are involved, lnspecuoru should be <br />(NIA) <br />requested at least ten days before caul bum is plirined" <br />fj <br />F-1 <br />psi Refining Factiitic5 <br />WA <br />90 t'lO days <br />II <br />(NIA) <br />If permit required application 60 days before begin construction. Applicant <br />must hire N.0 qualified enginterto- prepare plans inspeci construction <br />�permit <br />certify construction is according to ENR approved plans. May Also require <br />C <br />Dam Safety <br />under mosquito eontro) program, And a 404 pernut,from Corps of <br />30 days <br />Permit <br />Engineers. An Inspection of site is necessary so verify Harard Classification A <br />(60 days) <br />minimum fee ofS200.00 must accompany the application An additional <br />processing let based on a percentage or the total project east will be required <br />upon completion. <br />
The URL can be used to link to this page
Your browser does not support the video tag.