Orange County NC Website
5 <br />c. EAST: Single- family residential lots, large undeveloped parcels of <br />property zoned RB. <br />d. WEST: Cascade Drive, single - family residential lots zoned RB. <br />Proposal: The applicant is proposing to develop a Solar Array - Public Utility on the <br />aforementioned properties. As detailed within Attachment 1, the applicant is proposing to erect <br />individual solar array panels on the northern portion of the properties. The Bishop's, who are one of <br />the applicants for this project, will have approximately 1 acre of their 5 acre parcel of property <br />encumbered by individual panels. The array will be approximately 200 feet from an existing structure <br />on the property. <br />A typical array is 6 to 10 feet in height, with approximately 2' to 3' feet of ground clearance depending <br />on the panel angle. The arrays will be screened by existing vegetation and any installed landscaping <br />as depicted on the submitted site plan. An 8 foot high chain link security fence shall enclose the <br />perimeter of the array to prevent access. Gravel paths /drives will be installed around these arrays in <br />order to permit technicians to service the panels. <br />The applicant is indicating they will observe a 50 foot landscaped buffer along the property lines <br />abutting residentially zoned property as required by the UDO. They will also leave the southern <br />portion of the site (outside the security fencing) undeveloped. <br />Vehicular access to the site is restricted by an access gate off of Cascade Drive. The applicant is <br />not proposing to develop a business, habitable structures, or other similar office facilities on the <br />property. Therefore, no septic or well systems are proposed, or required, as part of the project. <br />According to the applicant the New Hope Volunteer Fire Department and Orange County EMS will <br />be provided a key to access the site in the event of an emergency. An overhead, medium voltage, <br />power line will be installed on the west of the identified leased area allowing the proposed facility <br />to tie into the power grid via the existing electrical substation to the west of the property. <br />Ordinance Requirements — Class A Special Use: in accordance with Section 5.9.6 (C) (2) Solar <br />Arrays of the UDO, the project is required to demonstrate compliance with the following <br />standards of evaluation: <br />(a) All on -site utility and transmission lines shall, to the extent feasible, be placed <br />underground. <br />STAFF COMMENT. Based on language provided on the site plan the applicant is <br />proposing to adhere to this requirement. <br />(b) The height of proposed arrays and support structures shall not exceed 40 feet. <br />STAFF COMMENT. Data on the submitted site plan, specifically the typical rack <br />height elevation, indicates the height of the racks will be approximately 6 -10 feet <br />from ground elevation. No other support structures, other than utility poles, are <br />proposed. <br />(c) Individual arrays /solar panels shall be designed and located in order to prevent <br />reflective glare toward any inhabited buildings on adjacent properties as well as <br />adjacent street rights -of -way. <br />STAFF COMMENT. Detail in the application narrative indicates the applicant will <br />comply with this provision. <br />