Browse
Search
Agenda - 05-27-2014 - C1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 05-27-2014 - Quarterly Public Hearing
>
Agenda - 05-27-2014 - C1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2015 4:19:07 PM
Creation date
5/16/2014 3:38:39 PM
Metadata
Fields
Template:
BOCC
Date
5/27/2014
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
C.1
Document Relationships
Minutes 05-27-2014
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14 <br />b Solid Waste- The solar facility does not generate any solid waste during normal operation. <br />Service crews will access the site periodically to perform routine grounds keeping. Any solid <br />waste collected during grounds keeping will be disposed of off -site in appropriate solid waste <br />facilities <br />c Water- The Binks Solar project does not consume water during normal operation Water will <br />be used semi - annually to clean the solar panels Water for panel cleaning will be obtained <br />off -site from an appropriate water company <br />(2) Method and adequacy of police, fire and rescue squad protection <br />a Police- The Binks Solar project is an unmanned solar facility The project site will be fenced to <br />prevent public access Because the site will not increase the general population of the <br />county, the project will not increase demand on existing law- enforcement agencies <br />b Fire and Rescue- The project site will be accessed from Cascade Drive The perimeter allows <br />vehicle access to the entire site, with two Interior North /South access corridors All rows of <br />panels are unobstructed and provide two points of entry As such, the design of the project <br />site provides adequate access for fire and rescue protection The project site will not require <br />additional fire and rescue personnel <br />(3) Method and adequacy of vehicular access to the site and traffic conditions around the site <br />The Binks Solar facility will be accessed from Cascade Drive Because the site will not be frequently <br />accessed, Cascade Drive will provide adequate access to the site and Cascade Drive's traffic conditions <br />will not be adversely impacted The frequency and nature of site access is described below. <br />The Binks Solar project is an unmanned facility, with no regular employees located on -site A <br />maintenance /service crew will be on -site for limited periods of time to service the equipment, clean the <br />PV panels, and to ensure that on -site vegetation is kept at appropriate levels Routine maintenance <br />generally will occur on a bi- monthly basis <br />
The URL can be used to link to this page
Your browser does not support the video tag.