Browse
Search
Agenda - 11-02-2006-5i
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 11-02-2006
>
Agenda - 11-02-2006-5i
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 1:27:01 AM
Creation date
8/28/2008 9:00:11 AM
Metadata
Fields
Template:
BOCC
Date
11/2/2006
Document Type
Agenda
Agenda Item
5i
Document Relationships
Minutes - 20061102
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 <br />Name: Robert Edwards <br />Address: 500 Gomains Ave. <br />City: Chapel Hill, N.C. 27516 <br />Phone: 942-6186 <br />Date: July 21, 2006 <br />Plumbing: <br />1. <br />2. <br />Install a new 4" PVC Schedule 40 sewer line from rear foundation <br />wall to the property line. Install a proper cleanout per code. <br />Make proper plumbing connections at unit and property line to <br />code. Seed and straw the exposed area. <br />NOTE: Install two (2) cleanouts- one beside unit and one at property <br />line. _ <br />Extend the existing 3/4 inch drainage line on the right side foundation <br />wall. Add a 4 ft section of pipe and trap as necessary per code. _ <br />3. Install a main water cut-off within a closet or within 3 feet of the <br />crawlspace opening. Extend water line as necessary to install <br />cut-off. <br />Mechanical: <br />1. Remove all un-insulated hard ductwork from the crawlspace. Install <br />insulated flex ductwork to all registers. Support new flex duct with <br />proper supports per code. Check all return and trunk line insulation <br />and reattach as necessary. <br />2. Install a proper vent cover for the furnace exhaust on the right side <br />foundation wall. Vent cover shall be approved by Code. <br />Insulation: <br />1. Remove existing R-13 insulation from the crawlspace. Install R-19 <br />faced insulation per code. <br />2. Add matching insulation in the attic to achieve an R-30 rating. <br />Install baffles as needed per code. <br />3. Install 6-mil poly in the crawlspace. Remove all debris from ground <br />before poly is installed. <br />Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.