Browse
Search
Agenda - 11-02-2006-5i
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 11-02-2006
>
Agenda - 11-02-2006-5i
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 1:27:01 AM
Creation date
8/28/2008 9:00:11 AM
Metadata
Fields
Template:
BOCC
Date
11/2/2006
Document Type
Agenda
Agenda Item
5i
Document Relationships
Minutes - 20061102
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br />Name: Robert Edwards <br />Address: 500 Gomains Ave. <br />City: Chapel Hill, N.C. 27516 <br />Phone: 942-6186 <br />Date: July 21, 2006 <br />Foundation: <br />6 <br />Install a new crawlspace door and frame. Install a 2x6 pressure <br />treated frame and 3/a inch pressure treated plywood door. Install <br />2 x 4 cross bracing to support door. Install new pressure treated 1x4 <br />trim around opening. Install new galvanized hinges and locking hasp. <br />New door to open, close and lock properly. _ <br />Roof /Gutters: <br />1. Remove the shingles and felt paper to the sheathing. <br />Note: Rehabilitation Specialist to inspect roof sheathing before <br />new felt paper is installed. Prepare sheathing for felt paper. <br />Check.roof decking for exposed nails-and damaged sheathing. <br />Install 151b felt paper, new vent boots, white eve starter, <br />galvanized chimney flashing and 25 year shingles. <br />Patch area around existing electric riser/mast. <br />Note: Shingles to be installed with proper fasteners and too <br />manufacturer specs. . <br />2. Install continuous aluminum gutters and downspouts on all <br />fascias. Color of gutters and downspouts to match. coil trim. <br />Note: Attach solid drain the to all downspouts. The front and rear <br />left downspout drain file can run beside the foundation drain tile. <br />The front right downspout drain tle shall run toward the right rear <br />away from the foundation. Check the locating service for under- <br />ground utlites before digging. <br />Windows: <br />1, Install ten (10) vinyl construction windows with built in J=channel and <br />nailing flange. Install all necessary,trim to properly install new windows. <br />(jamb extensions and matching casing) <br />New windows to be complete with screen, lock and openable sash. <br />Windows to open, close and lock properly. Apply all caullc necessary <br />to seal off air leaks. <br />Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.