Browse
Search
Agenda - 11-02-2006-5i
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 11-02-2006
>
Agenda - 11-02-2006-5i
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 1:27:01 AM
Creation date
8/28/2008 9:00:11 AM
Metadata
Fields
Template:
BOCC
Date
11/2/2006
Document Type
Agenda
Agenda Item
5i
Document Relationships
Minutes - 20061102
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
26 <br />Name: Kathy Atwater <br />Address: 314 Lindsay St. <br />City: Chapel Hill, N.C. 27514 <br />Phone Number: 942-8510 <br />Date: August 22, 2006 <br />ABATEMENT WORK: <br />Windows: <br />2 <br />3. <br />Install two vinyl fixed windows sashes/frames in the dormers. <br />All exposed wood to be wrapped with matching aluminum coil stock. <br />Caullc all seams with 100% white silicone caulk to prevent water <br />intrusion. Contractor to verify all window measurements. _ <br />Install eight (8) vinyl replacement windows. Windows shall be installed <br />from the interior. Remove all necessary wood trim on the interior to install <br />new vinyl windows. Install new window stop as necessary. <br />NOTE: ~ Vinyl replacement windows shall be double-hung tilt (both sash <br />open aa.1d tilt in to clean) Windows to be complete with screen and lock. <br />All new windows to open, close and lock properly. <br />Prime and paint all new trim installed on interior. <br />ABATEMENT WORK: <br />Exterior: <br />Remove the front door and interior casing. Wrap in 6-mil poly <br />and properly dispose of and landfill. Prepare the exterior front door <br />jamb, frame and side frames for lead a lead block primer. Remove all <br />loose chipping /peeling paint. Wet sand and feather edges and prime <br />with a lead block oil primer. NOTE: Abatement Contractor shall use <br />all guideluzes to prevent lead dust from migrating into the unit. _ <br />2. Prepare the front porch ceiling and trim for vinyl. Remove all loose <br />chipping /peeling paint: Enclose all wood front porch components with tyveclc. <br />Install solid vinyl soffit on the ceiling. Wrap all exposed wood with <br />white aluminum coil stock. Install all necessary J-channel and vinyl <br />trim to properly install vinyl and aluminum. <br />ABATEMENT WORK: <br />Interior: Room # 1 Foyer <br />1. <br />Remove the door leading to room # 10 (center hall) Wrap in 6-lnil <br />poly and properly dispose of at landfill. <br />Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.