Browse
Search
Agenda - 11-02-2006-5i
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 11-02-2006
>
Agenda - 11-02-2006-5i
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 1:27:01 AM
Creation date
8/28/2008 9:00:11 AM
Metadata
Fields
Template:
BOCC
Date
11/2/2006
Document Type
Agenda
Agenda Item
5i
Document Relationships
Minutes - 20061102
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
25 <br />Name: Kathy Atwater <br />Address: 314 Lindsay St. <br />City: Chapel Hill, N.C. 27514 <br />Phone Number: 942-8510 <br />Date: August 22, 2006 <br />Note: Prior to conducting Lead-Based Paint Abatement activities, all personnel <br />associated with the project should review and fully understand the requirements of <br />ALL applicable local, state, and federal regulations that may apply to.the worksite. <br />Worccsite Preparation: <br />Ground Containment: <br />1. Before construction, construct a worlcsite perimeter curb of <br />2x4 timbers, ten feet from the house exterior. Create an outer <br />barrier of flags and/or plastic tape 3 feet on center and 20 feet <br />from the worlcsite. All warning signs must remain posted until <br />clearance is passed. (Front Porch Area & Dormer) <br />2. During the period of work on the exterior components, atCach one <br />layer of 6-mil poly to the building exterior with :furring strips, <br />extending 10 feet past the worksite. Wrap the plastic under the <br />perimeter 2x4's. Change the plastic daily. <br />Clearance Examination: <br />1. After completion of all work that disturbed LBP and any other lead <br />hazard reduction activities, a qualified person shall perform a <br />clearance examination. Worlc disturbing lead-based paint is not <br />considered complete until clearance is achieved. <br />Pre-Clean: <br />Pre-clean all interior locations containing lead paint. (Refer to <br />Risk Assessment /Lead Paint Inspection) HEP.A vacuum <br />all horizontal surfaces, to include all floors, windowsills, troughs, <br />baseboards and casing. <br />ABATEMENT WORK: <br />Windows: <br />Remove both dormer window sashes and frames. Wrap in 6-mil <br />poly and properly dispose at landfill. <br />
The URL can be used to link to this page
Your browser does not support the video tag.