Browse
Search
Agenda - 11-02-2006-5i
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 11-02-2006
>
Agenda - 11-02-2006-5i
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 1:27:01 AM
Creation date
8/28/2008 9:00:11 AM
Metadata
Fields
Template:
BOCC
Date
11/2/2006
Document Type
Agenda
Agenda Item
5i
Document Relationships
Minutes - 20061102
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
24 <br />Name: Kathy Atwater <br />Address: 314 Lindsay St. <br />City: Chapel Hill, N.C. 27514 <br />Phone Number:.942-8510 <br />Date: August 22, 2006. <br />This set of work specifications outlines work items that were found to contain lead in <br />concentrations above acceptable levels as set in the U.S. Department of Housing and <br />Urban Development (]~i.TD) standards. It is recommended, that any lead hazard <br />remediation work be conducted by workers who are certified by the state to perform lead <br />abatement work. <br />Lead hazard remediation work must be preformed in compliance with the regulations <br />issued by the Secretary of Housing and Urban Development set forth in 24 CRF Part 3S, <br />et al and all applicable rulers and any others issued there-under, and all applicable <br />Federal, State and local rules and regulations, regarding notification, evaluation and <br />reduction oflead-based paint hazards in residential structures undergoing Federally- <br />Assisted construction or rehabilitation and require the elimination oflead-based paint <br />hazards. Every contractor or subcontractor, including painting, pursuant to which such <br />Federally-assisted construction of rehabilitation is performed, shall include appropriate <br />provisions complying with requirements for notification, evaluation and reduction of <br />lead-based paint hazards. <br />The contractor shall be allowed to include in the cost of the project the allowable fee for <br />one (1) complete clearance inspection of the remediation work performed. The cost of <br />any additional clearance inspections which may be necessary will be born directly by the <br />contractor. <br />Contractor must submit a copy of training certification with their bid. <br />
The URL can be used to link to this page
Your browser does not support the video tag.