Browse
Search
Agenda - 11-02-2006-5i
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 11-02-2006
>
Agenda - 11-02-2006-5i
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 1:27:01 AM
Creation date
8/28/2008 9:00:11 AM
Metadata
Fields
Template:
BOCC
Date
11/2/2006
Document Type
Agenda
Agenda Item
5i
Document Relationships
Minutes - 20061102
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18 <br />Name: Kathy Atwater <br />Address: 314 Lindsay St. <br />City: Chapel Hill, N:C. 27514 <br />.Phone Number: 966-4321 <br />Date: September S, 2006 <br />Insulation: <br />1 <br />Bathroom: <br />Page 6 <br />1. Install a new hollow core bathroom door. New door shall open out. <br />Refer to Rehab. Specialist for installation. Install new hinges and <br />privacy lockset. Install new door stop. Stain door and trim to <br />match. <br />Kitchen: <br />1. Remove the metal wall cabinets located above the kitchen sink. <br />Install a dropped soffit for new cabinets. Frame and finish soffit <br />with %z" sheetrock. Finish smooth, prime and paint. <br />2. ,Install new wood wall cabinets designed to accommodate a <br />vented exhaust hood for the oven. Homeowner shall choose <br />.finish. Cabinets to have. hardwood fronts and a factory finish. <br />Install matching linear feet of wall cabinets. (8.S linear ft) <br />Note: New cabinets shall be complete with all necessary hardware. <br />3. Install a vented exhaust hood over the oven. The exhaust hood <br />shall be vented to outside air. (roof) Make all mechanical. and <br />electrical connections to code. <br />Center Hall <br />1. Install a new disappearing stairway. New stairway to open and close <br />properly. Trim steps to properly open to finish floor. Stain door to <br />match existing stain in hallway. Size- 2S" x S4" _ <br />Install R-19 insulation in the crawlspace. Insulation to be inspected <br />by Chapel Hill Inspection Dept. <br />
The URL can be used to link to this page
Your browser does not support the video tag.