Browse
Search
Agenda - 11-02-2006-5i
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 11-02-2006
>
Agenda - 11-02-2006-5i
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 1:27:01 AM
Creation date
8/28/2008 9:00:11 AM
Metadata
Fields
Template:
BOCC
Date
11/2/2006
Document Type
Agenda
Agenda Item
5i
Document Relationships
Minutes - 20061102
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />16 <br />Name: Kathy Atwater <br />Address: 314 Lindsay St. <br />City: Chapel Hill, N.C. 27514 <br />Phone Number: 966-4321 <br />Date: September 5, 2006 <br />Electrical: <br />Page 4 <br />1. ,Rewire unit to new electrical code. Electrical to include underground <br />service per Chapel Hill Inspection Dept. Work to include Arc-.fault . <br />brealcers, GFI receptacles, hardwired smoke detectors. <br />Install 200 amp service and new meter base. Install new switches, <br />receptacles and cover plates. All fixtures to be wired to new electric <br />code. All work to pass Current Electric Code. <br />2.. Re-install all existing interior ceiling/wall light fixtures in unit. <br />3. Install new exterior light fixtures at both doors. Light. fixtures shall <br />be.approved for exterior use. Fixtures allowance is $ 25.00 per <br />fixture. <br />4. Remove existing sump pump. Remove all water from sump hole. <br />Clean hole of all debris and apply a water proof coating to the <br />outer lining. <br />5. Install a new sump pump of matching hp. Make all plumbing <br />and .electrical connections. Support discharge line through <br />crawlspace. Provide homeowner with owner's manual and <br />literature. <br />6. Install service lights in the crawlspace and attic. The lights to be <br />controlled by a wall switch within aft of the opening. <br />Install two (2) lights in the attic and crawlspace. <br />
The URL can be used to link to this page
Your browser does not support the video tag.