Browse
Search
Agenda - 11-02-2006-5i
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 11-02-2006
>
Agenda - 11-02-2006-5i
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 1:27:01 AM
Creation date
8/28/2008 9:00:11 AM
Metadata
Fields
Template:
BOCC
Date
11/2/2006
Document Type
Agenda
Agenda Item
5i
Document Relationships
Minutes - 20061102
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13 <br />Name: Kathy Atwater <br />Address: 314 Lindsay St. <br />City: Chapel Hill, N.C. 27514 <br />Phone. Number: 966-4321 <br />Date: September 5, 2006 <br />Exterio~°: <br />Remove the brick curtain walls from the left front steps to the <br />right side of the back door steps. (Refer to Rehab. Specialist for location) <br />Dig footings per Code for new brick curtain walls. (Refer to Specs) Install brick <br />curtain walls with matching brick.. Note: New curtain wall shall be <br />attached to the brick pier with proper straps approved by the Chapel Hill <br />Inspection Dept. All brick shall be properly laid and all joints struck. <br />Install all necessary fill dirt to landscape against wall. All soil shall <br />slope away from foundation wall. Seed and straw exposed area. <br />2. .Add eight (8) automatic foundation vents in the foundation walls. <br />The new foundation vents maybe installed in the new curtain <br />walls. <br />4. <br />Remove and replace six (6) stone/brick piers with brick piers. Install <br />proper footings approved by the Chapel Hill Inspections Dept. <br />Install new brick piers per Code. Note: Contractor shall pull sfxing- <br />line for proper pier height. (Refer. to Specification Sheet) _ <br />Add eight (8) brick piers to the floor system girders. Refer to Rehab. <br />Specialist for proper location. Install footings for piers per Code. <br />Note: Contractor shall run string lines for proper pier height. ; <br />All work shall pass the Building Code with Chapel Hill Inspection <br />Dept. (Refer to Specification Sheet) _ <br />5. Install three (3) pressure treated dropped girders along the entire <br />width of the unit. Refer to Rehab. Specialist for proper location. <br />Install concrete piers approved by the Chapel Hill Inspection Dept. <br />Pier spacing shall be 78" OC. Install adjustable post jacks to support <br />a pressure treated triple 2x8 dropped girder. Note: Contractor shall run <br />string lines for proper floor height. (Refer to Specification Sheet) _ <br />6. Re-screen the front porch with black vinyl screen. Install new <br />lattice strips at all necessary locations. Prime and paint lattice <br />with semi-gloss latex paint. <br />
The URL can be used to link to this page
Your browser does not support the video tag.