Orange County NC Website
W <br />• Location on major roads <br />• Additional setback requirements <br />• Noise <br />• Hours of Operation <br />• Groundwater usage <br />• Building size <br />• Minimum lot size <br />In addition to all requirements in the UDO <br />Permitted Outright vs. SUP or Conditional Zoning <br />• Less intensive uses added to the Table of Permitted Uses as permitted outright <br />(example for AR zoning district; other zoning districts are also affected) <br />• Subject to use - specific and general development standards <br />• Community Agricultural Processing Facility <br />• Community Farmers Market <br />• Cooperative Farm Stand <br />• Community Meat Processing Facility <br />• Non -Farm Use of Farm Equipment <br />• Rural Special Events <br />• Check "Definitions" to see how these uses are defined <br />• Staff approval <br />• More intensive uses must be permitted through either the Special Use Permit process or <br />rezoned as an ASE -CZ <br />• Class B Special Use Permit (in AR zoning district): <br />• Microbrewery with Minor Events <br />• Taxidermy <br />• Winery with Minor Events <br />• Microbrewery, Production Only <br />• Winery, Production Only <br />• Veterinary Clinic <br />• Veterinary Clinic, mobile <br />• Rural Heritage Museum <br />• Class A Special Use Permit (in AR zoning district): <br />• Equestrian Center <br />• Special Use Permits are "quasi- judicial" proceedings <br />• Public Hearing <br />• Decided on a case -by -case basis with public input ( "evidence ") <br />Conditional Zoning District (ASE -CZ) <br />• Conditional zoning districts allow projects to be considered on a case -by -case, site - <br />specific basis <br />• Rezoning (legislative process) with public hearing <br />• Acknowledges that there are places where a specific type of use may be appropriate <br />whereas it would not be in a different site - specific situation <br />• BOCC has final decision on whether a proposed use(s) is compatible with <br />surrounding uses <br />• Mutually agreed upon conditions can be imposed as part of the approval process <br />• Allows tailoring of project to a specific site <br />• Table of Permitted Uses lists the types of uses that can be applied for as an ASE -CZ <br />Change in groundwater usage standard language <br />